BOILER REPLACEMENT: MODENA 80/102 TO MODENA C E 

 

 

 

9.

 

It  is  suggested  that  where  possible  the  existing 

pipe-work is cut back approximately 200mm - 300mm 

for  ease  of  connecting  the  existing  pipe-work  to  the 

new valves (Fig 8) 

 

 

 

If a stand-off bracket has been used and the pipe-work runs 

behind the boiler, then a new stand-off bracket will need to 

be  fitted  and  pipes  extended  to  the  position  previously 

marked. (paragraph 3.)

 

 

 

 

 

 

 

10.

 

Remove  the  condensate  bowl  and  hose  from  the 

boiler  fittings  pack.  Undo  plastic  nut  (Fig.9-A)  and  fit 

the condensate bowl and washer. Push on the rubber 

condensate hose to the trap outlet (Fig.9-B). 

 

Fig.8

 

 

 

 

 

 

 

 

Cut existing pipes back 

approx 200mm – 300mm

 

 

 

 

 

 

 

 

 

 

Condensate bowl, 
washer and rubber 
hose connection

 

 

 

 

 

 

 

 

 

Connect  the  safety  valve  outlet  (Fig.9-C)  to  the 

existing 15mm pipe and then connect the condensate 

pipe  to  the  rubber  hose  outlet.  Check  that  both 

terminate in accordance with – BS 6798. 

Take  care  not  to  interfere  with  the  new  routes  for 

gas, water and heating pipe connections 

Fig.9

 

 

 

 

 

 

 

 

 

 

 

A

 

 

 

Fig 10 

 

10.

 

Fit  the  valve  kit  to  the  connections  on  the 

underside  of  the  boiler  using  the  washers  provided 

(Fig 10) and reconnect to the existing pipe-work. 

 

 

 

CH FLOW 

HOT WATER OUTLET 

GAS 

COLD WATER INLET 

CH RETURN 

 

 

Содержание MODENA 27 C HE

Страница 1: ...Ferroli Modena HE 21st Century Design for 21st Century Life ...

Страница 2: ... left of the existing boiler no alteration to the existing flue position is necessary Please note As with all condensing boilers it is necessary to check the existing flue terminal position to ensure that the plume from the combustion products will not create a nuisance problem A plume displacement kit is available to overcome any such problems Consideration must also be given for the provision of...

Страница 3: ... securing screws on the underside of the boiler Ease the lower edge of the case forward to clear the controls panel and lift the case upwards off the retaining lugs Fig 1 Case Securing Screws Fig 1 2 Safely isolate the electricity gas and water supplies to the appliance Completely drain the boiler and central heating system and disconnect all existing pipe work connections from the underside of th...

Страница 4: ...and check the contents are complete and undamaged see opposite Please note The new flue kit is sold separately 3 Align the fixing template on the wall with the existing flue hole ensuring it is level both horizontally and vertically Check for required minimum clearances then mark the most suitable fixing points for the hanging bracket It is advisable to mark the position of the gas water and heati...

Страница 5: ...er frame Fig 6 FOR STANDARD HORIZONTAL TELESCOPIC FLUE INSTALLATIONS Fig 6 UNPACK THE NEW TELESCOPIC FLUE KIT CODE 041049G0 7 Remove the protective adhesive cover from the top of the boiler to expose the flue fixing holes Secure the new appliance flue bend to the top of the boiler using the screws and gasket provided 8 From the outside push the flue terminal length through the existing hole in the...

Страница 6: ... A and fit the condensate bowl and washer Push on the rubber condensate hose to the trap outlet Fig 9 B Fig 8 Cut existing pipes back approx 200mm 300mm Condensate bowl washer and rubber hose connection Connect the safety valve outlet Fig 9 C to the existing 15mm pipe and then connect the condensate pipe to the rubber hose outlet Check that both terminate in accordance with BS 6798 Take care not t...

Страница 7: ... work by opening all the hot taps 13 Reinstate the gas supply purge and test in accordance with BS 6891 and IGE UP 1 14 Connect the boiler to the electrical supply the boiler is provided with a 1m cable and plug Reconnect any external controls to the volt free terminal block in the boiler To access the connections remove the securing screw and hinge the controls cover to the left Connect the exter...

Страница 8: ... note there may be a pressure loss across the isolation valve to the gas valve inlet test point of up to 1 3 mbar at maximum Remove the manometer re tighten the inlet test point 14 Measure the gas rate of the boiler and check against the following table 15 Connect the flue gas analyser to the flue sample point Fig 15 with the boiler still in TEST MODE check that the readings are within the toleran...

Страница 9: ...Ferroli 21st Century Design for 21st Century Life www ferroli co uk 0843 479 0009 Ferroli Limited Lichfield Road Branston Industrial Estate Burton upon Trent Staffordshire DE14 3HD Modena HE ...

Отзывы: