background image

BOILER REPLACEMENT: MODENA 80/102 TO MODENA C E 

 

 

 

5.

 

Ensure  that  all  pipe  connections  are  free,  move 

the base of the boiler forward and lift the boiler off 
the hanging bracket tabs. 

 

 

Finally, unscrew the hanging bracket from the wall. 

 

 

 

 

Check that the wall surface is sound, flat and capable 

of  supporting the  weight  of  the  boiler.  Make  any 

necessary repairs before installing the new boiler. 

 

 

 

 

 

INSTALL THE NEW MODENA C HE 

 

 

 

 

1.

 

Check the existing flue terminal position with 

regard to possible nuisance “pluming” and plan 

the route for the condensate outlet. 

 

2.

 

Unpack the boiler and check the contents are 

complete and undamaged (see opposite) 

 

Please note: 

The new flue kit is sold separately 

 

 

 

3.

 

Align the fixing template on the wall with the 

existing  flue  hole,  ensuring  it  is  level  both 

horizontally  and  vertically.  Check  for  required 

minimum  clearances  then  mark  the  most 

suitable fixing points for the hanging bracket. It 

is  advisable  to  mark  the  position  of  the  gas, 

water and heating pipes at this point (Fig.5) 

 

 

 

 

 

4.

 

Drill  the  wall  and  fix  the  hanging  bracket 

using the wall plugs and fixings provided. Make 

sure  the  bracket  is  level  before  tightening  the 

fixing screws 

Boiler Pack Contents 

1 x Modena C HE Boiler 
1 x Installation Instructions 
1 x Hanging Bracket 
1 x Filling Loop 
1 x Valve Pack 
1 x Condensate Bowl/Hose 
1 x Paper Template 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fig.5 

 

 

Содержание MODENA 27 C HE

Страница 1: ...Ferroli Modena HE 21st Century Design for 21st Century Life ...

Страница 2: ... left of the existing boiler no alteration to the existing flue position is necessary Please note As with all condensing boilers it is necessary to check the existing flue terminal position to ensure that the plume from the combustion products will not create a nuisance problem A plume displacement kit is available to overcome any such problems Consideration must also be given for the provision of...

Страница 3: ... securing screws on the underside of the boiler Ease the lower edge of the case forward to clear the controls panel and lift the case upwards off the retaining lugs Fig 1 Case Securing Screws Fig 1 2 Safely isolate the electricity gas and water supplies to the appliance Completely drain the boiler and central heating system and disconnect all existing pipe work connections from the underside of th...

Страница 4: ...and check the contents are complete and undamaged see opposite Please note The new flue kit is sold separately 3 Align the fixing template on the wall with the existing flue hole ensuring it is level both horizontally and vertically Check for required minimum clearances then mark the most suitable fixing points for the hanging bracket It is advisable to mark the position of the gas water and heati...

Страница 5: ...er frame Fig 6 FOR STANDARD HORIZONTAL TELESCOPIC FLUE INSTALLATIONS Fig 6 UNPACK THE NEW TELESCOPIC FLUE KIT CODE 041049G0 7 Remove the protective adhesive cover from the top of the boiler to expose the flue fixing holes Secure the new appliance flue bend to the top of the boiler using the screws and gasket provided 8 From the outside push the flue terminal length through the existing hole in the...

Страница 6: ... A and fit the condensate bowl and washer Push on the rubber condensate hose to the trap outlet Fig 9 B Fig 8 Cut existing pipes back approx 200mm 300mm Condensate bowl washer and rubber hose connection Connect the safety valve outlet Fig 9 C to the existing 15mm pipe and then connect the condensate pipe to the rubber hose outlet Check that both terminate in accordance with BS 6798 Take care not t...

Страница 7: ... work by opening all the hot taps 13 Reinstate the gas supply purge and test in accordance with BS 6891 and IGE UP 1 14 Connect the boiler to the electrical supply the boiler is provided with a 1m cable and plug Reconnect any external controls to the volt free terminal block in the boiler To access the connections remove the securing screw and hinge the controls cover to the left Connect the exter...

Страница 8: ... note there may be a pressure loss across the isolation valve to the gas valve inlet test point of up to 1 3 mbar at maximum Remove the manometer re tighten the inlet test point 14 Measure the gas rate of the boiler and check against the following table 15 Connect the flue gas analyser to the flue sample point Fig 15 with the boiler still in TEST MODE check that the readings are within the toleran...

Страница 9: ...Ferroli 21st Century Design for 21st Century Life www ferroli co uk 0843 479 0009 Ferroli Limited Lichfield Road Branston Industrial Estate Burton upon Trent Staffordshire DE14 3HD Modena HE ...

Отзывы: