BOILER REPLACEMENT: MODENA 80/102 TO MODENA C E
5.
Ensure that all pipe connections are free, move
the base of the boiler forward and lift the boiler off
the hanging bracket tabs.
Finally, unscrew the hanging bracket from the wall.
Check that the wall surface is sound, flat and capable
of supporting the weight of the boiler. Make any
necessary repairs before installing the new boiler.
INSTALL THE NEW MODENA C HE
1.
Check the existing flue terminal position with
regard to possible nuisance “pluming” and plan
the route for the condensate outlet.
2.
Unpack the boiler and check the contents are
complete and undamaged (see opposite)
Please note:
The new flue kit is sold separately
3.
Align the fixing template on the wall with the
existing flue hole, ensuring it is level both
horizontally and vertically. Check for required
minimum clearances then mark the most
suitable fixing points for the hanging bracket. It
is advisable to mark the position of the gas,
water and heating pipes at this point (Fig.5)
4.
Drill the wall and fix the hanging bracket
using the wall plugs and fixings provided. Make
sure the bracket is level before tightening the
fixing screws
Boiler Pack Contents
1 x Modena C HE Boiler
1 x Installation Instructions
1 x Hanging Bracket
1 x Filling Loop
1 x Valve Pack
1 x Condensate Bowl/Hose
1 x Paper Template
Fig.5