![Ferroli 47-267-74 Скачать руководство пользователя страница 38](http://html.mh-extra.com/html/ferroli/47-267-74/47-267-74_instructions-for-use-installation-and-maintenance_2281844038.webp)
BlueHelix HiTech RRT C
38
EN
cod. 3541V691 - Rev. 00 - 04/2022
To open the boiler casing:
1. Undo the screws “1” (see fig. 44).
2. Pull the panel outwards and lift it.
fig. 44- Front panel opening
B
On this unit, the casing also acts as a sealed chamber. After any operation
involving opening the boiler, carefully check the correct refitting of the front
panel and its seal.
Proceed in reverse order to refit the front panel. Make sure it is correctly hooked to the upper fastenings and is correctly
positioned at the sides. Once the screw
"1”
is tightened, the head must not be below the lower reference fold (see
fig. 45).
fig. 45- Correct position of front panel
2
3
1
1
OK
NO
1
1
Содержание 47-267-74
Страница 42: ...BlueHelix HiTech RRT C 42 EN cod 3541V691 Rev 00 04 2022 fig 51 fig 52 fig 53 5 6 6 ...
Страница 61: ......
Страница 62: ......
Страница 63: ......