![Ferroli 47-267-74 Скачать руководство пользователя страница 17](http://html.mh-extra.com/html/ferroli/47-267-74/47-267-74_instructions-for-use-installation-and-maintenance_2281844017.webp)
BlueHelix HiTech RRT C
17
EN
cod. 3541V691 - Rev. 00 - 04/2022
2. Installation
2.1 General Instructions
B
This unit must only be used for its intended purpose. This unit is designed to heat
water to a temperature below boiling point and must be connected to a heating sys-
tem and/or a water supply system for domestic use, compatible with its performan-
ce, characteristics and its heating capacity. Any other use is deemed improper.
BOILER INSTALLATION MUST ONLY BE CARRIED OUT BY QUALIFIED PERSONNEL, IN ACCORDANCE WITH
ALL THE INSTRUCTIONS GIVEN IN THIS TECHNICAL MANUAL, THE PROVISIONS OF CURRENT LAW, THE
PRESCRIPTIONS OF THE TECHNICAL STANDARDS (BS), ANY LOCAL REGULATIONS AND THE RULES OF
PROPER WORKMANSHIP.
Incorrect installation can cause damage or injury for which the manufacturer declines any responsibility.
Installation of this unit must be carried out in strict compliance with the present instructions and the following
regulations applicable in Great Britain.
Gas Safety Regulations (Installations & Use).
Local Building Regulations..
The Building Regulations (Part L).
The Buildings Standards (Scotland - Consolidated) Regulations. British Standards Codes of Practice (BSI):
Model Water By-Laws
For Northern Ireland, observe the current applicable regulations.
Safe handling of materials
Pay attention when handling the boiler insulation panels because the material they are made of could irritate the skin.
No part of the boiler contains asbestos, mercury or CFC's.
Advice for transport and handling
For lifting and transport always take suitable safety precautions: keep your back straight, bend knees, do not turn your
body, move feet, avoid bending forward or sideways and keep the load as close as possible to your body.
If possible, use a trolley or other suitable means to carry the boiler.
Grip the boiler firmly and, before lifting it, try and find the point where the load is concentrated in order to establish the
centre of gravity and suitably reposition yourself.
B.S.
5440
Detail 1
Flues
B.S.
5440
Detail 2
Air supply and ventilation
B.S.
5449
.........
Systems for hot water production with forced circulation
B.S.
6798
.........
Installation of gas-fired boilers for hot water
B.S.
6891
.........
Gas systems
B.S.
7671
.........
IEE wiring system regulations
B.S.
4814
.........
Specifications for expansion tanks
B.S.
5482
.........
LPG systems
B.S.
7593
.........
Water treatment in central heating systems for domestic hot water production
B.S.
5546
.........
Installation of systems for domestic hot water production
B.S.
5955-8
.........
Installation of plastic pipes
Содержание 47-267-74
Страница 42: ...BlueHelix HiTech RRT C 42 EN cod 3541V691 Rev 00 04 2022 fig 51 fig 52 fig 53 5 6 6 ...
Страница 61: ......
Страница 62: ......
Страница 63: ......