When using PoE, the output of 12V is connected galvanically with the PC network.
Therefore when using PoE power supply, please pay attention during manipulation
and installation. The circuit is connected galvanically with the computer network!!!
1.4.3. Front panel
1. Assembly openings for mounting of the
front panel. After installation of the top
opening, please cover it with the plastic
cover with Fermax logo. When bottom
opening please cover with the grey,
round plastic cover. Both covers incl.
the screws are part of delivery as
accessories.
2. Loudspeaker.
3. Camera with illumination and a sensor
for switching on the illumination.
4. Pushbuttons. These two pushbuttons
can be found on the basic electronics
module (the main PCB). In case you use
a
panel without these first two pushbuttons, then please leave them out during the
programming process (pushbuttons 1 and 2).
5. Visit card. The exchange of visit card is described later on in the manual. The visit
card is illuminated by white LEDs (they can be switched off). You can also find a
red LED under the visit card - it is used for signallisation of the door phone panel
status.
6. Microphone.
1.4.4. Exchange of visit cards
The visit cards are disassembled from the front of the
door phone panel as shown on the picture. Please use a
tool carefully, do not damage the front panel or the
cover of visit cards. The cover of visit cards is a tub into
which you place the paper with descriotion (the visit
card).
15
Содержание PBX EA
Страница 17: ...Picture 5 Connection of expansion modules 17 ...
Страница 38: ...3 1 11 Restart ...
Страница 42: ......