21
2040
1800
650
320
920
1240
A
B
C
D
Edgebander with glue pot
G 200 / G 220
Setup and installation
Fig. 9: Space requirements G 200
The machine can also be bolted to the floor if required.
Fig. 9-1: The workspace shown
The workspace shown in the picture makes it possible for
the operator to operate the control elements easily.
The workspace for maintenance and cleaning is also
pictured.
A
3000 mm
B
2000 mm
C
1000 mm
D
1750 mm
7.2.2 Array of the machine
7.2.1 Space requirements/ Measurements
The machine is delivered with a nylon protection or car-
ton; in both cases, for transport necessities, some parts of
the machine are detached. To assemble and adjust these
parts (see Fig. 11).
Locate the machine in a suitable place, considering the
dimensions of the machine, space needed for stacking,
loading and offloading workpieces, leaving sufficient
space for the operator to move freely (Locate the machi-
ne in a suitable place, considering the dimensions of
the machine, space needed for stacking, loading and
offloading workpieces, leaving sufficient space for the
operator to move freely (see Fig. 11).
The machine base must be layed on a even solid surface.
Make sure, by using a water level or any other equiva-
lent good quality level, that the working table is levelled
in both directions. Tolerance ± 0,25 mm in longitudinal
direction.
Содержание G 200
Страница 47: ......