GB
13
①
stock support plate 1pcs
②
protection guard 1pcs
③
back cover 1pcs
④
left cover
1pcs
⑤
connection plate
1pcs
⑥
right cover
1pcs
⑦
fixed 17
pcs
⑧
Inner hexagon bolt M8×16
5pcs
⑨
Square neck bolt M8×16 4
pcs
⑩
Inner hexagon bolt M8×16 4
pcs
1
、
Step 1: first, unscrew the butterfly air release screw
Step 2: Make the two
inner hexagons bolts M8×16
⑧
and two M8 gaskets, successively
through the installation hole of the left
cover
④
, use the hexagon wrench and the screw hole
on the left leg for connection and fixation.
Step 3: Make the three
inner hexagons bolts M8×16
⑧
and three M8 gaskets,
successively through the installation hole of the right cover
⑥
, use the hexagon wrench and
the screw hole on the right leg for connection and fixation.
Step 4: Make the
square neck bolts M8×16
⑨
, successively through the installation hole
of left and right cover
④⑥
and connecting plate
⑤
, use the wrench to tighten the four M8
anti-loose nuts. See figure 1
Step 5: Make the two
inner hexagon bolts M8×16
⑩
successively through the installation
hole of right and left cover
④⑥
and the stock support plate
①
, at the same time, use the
hexagonal wrench and the general wrench to tighten the two M8 nuts and bolts.
Step 6: Make the two
inner hexagon bolts M8×16
⑩
successively through the installation
hole of the supporting plate and the stock support plate
①
, at the same time use the
hexagonal wrench and general wrench to tighten the two M8 nuts and bolts. See figure 1