3. PACKAGE CONTENTS
Pos.
Description
Qty
A1
Handle with pre-installed rods and wires
1
A2
Separate handle with bolts
1
B
Handle fastening screws
4
C
Handle fastening bolts
4
D
Spark plug removal key
1
E
Nuts and bolts
4
NOTES
:
1. Cautiously open the packaging, paying attention not to lose components.
2. Consult the documentation in the box, including these instructions.
3. Remove all the unassembled parts from the box.
4. Remove the machine from the box.
5. Dispose of the box and packaging in compliance with local regulations.
4. ASSEMBLY
Please note that during assembly, maybe you’ll need a helper!
1. Forward and brush control cable assembly
Couple the cable eyelet to the specific opening (fig. 3).
NOTE:
The cables are already pre-assembled on the dashboard.
09