9.4 Installing the Base Unit
Either by measurement or using the template in Appendix 1, mark out and drill (and plug) the
surface to which the controller is to be fixed.
If the fixing screws are not in a convenient position for the surface on which the controller is to be
fixed then the use of rails, frames or battens is recommended.
DO NOT DRILL HOLES THROUGH THE ENCLOSURE BASE
The fixing screws are in the same position as the top cover retaining screws. The maximum screw
diameter is 4.5mm (0.178”) and a maximum head diameter of 8.5mm (0.33”). Recommended
screw sizes are Metric M4 or USA No. 8 of a suitable length and type for the surface.
Mount the base of the enclosure and ensure that the fixing screws are secure but do not over-
tighten as this could damage the enclosure and compromise the IP65 rating.
Once the base has been fitted, the unit can be wired up (next section). Take particular care not to
damage the Power Supply Unit, Relay Driver board and Relays during the installation of cables.
In anticipation that many installations will only require two cables to be fitted, one of the cable
glands is fitted with a nylon plug to ensure integrity of the enclosure if only two cables are required.
To use this gland, simply remove the plug. If replacing, do not over-tighten as this may
permanently damage the gasket.
9.5 Installing the Cell aerial
The Cell aerial is shipped in the outer accessory packaging. Carefully remove it from the plastic
bag and screw onto the external aerial connector. Do not over-tighten as this may permanently
damage the aerial or socket but ensure it is fully home.
Be careful when handling the front panel to ensure that the aerial is not damaged.