FCI WATERMAKERS, INC.
4
FCI WATERMAKERS, INC.
General
PREFACE
We are committed to customer service that exceeds your expectations. If at any
time you have questions about what’s covered in this manual, our hands‑on
technical support will never leave you adrift. This manual contains technical
information & instructions for the installation, operation, maintenance, and
troubleshooting for FCI Watermakers Desalination Systems. Anyone responsible
for the installation, operation, and maintenance of a FCI Watermakers Desalination
System must read and understand the contents of this manual, and comply
with these instructions, guidelines and safety requirements at all times.
The term
system
will be used throughout this manual, and it generally refers to
the FCI Watermakers System. Reading this manual in its entirety will familiarize
you with the system and the operation of its components. By understanding
the system in its entirety, one can readily operate and diagnose problems.
All references within this manual refer to other sections unless specifically
defined. Graphics and illustrations are used for reference only and may not
represent the actual part or arrangement of parts in a customized system.
ABOUT SAFETY NOTES
Safety issues requiring users attention are highlighted throughout this manual as follows:
WARNING:
Provides critical information in order to prevent the possibility of injuries and/or death.
CAUTION:
Provides important information to prevent the possibility
of damaging the device or equipment.
NOTE:
Provides additional information to safely and properly operate the equipment.
NEW SYSTEM PERFORMANCE
Although each system has been fully tested prior to shipping, there will be a
break‑in period. During this period, approximately 48 hours, the pumps and
membrane performance will change or settle. Small adjustments will need to be
made to the high‑pressure valve and the water quality and quantity will vary.
For installations without APC, the high‑pressure valve will need to be increased
(turned clockwise) and the water quality produced will improve over this break‑
in period. For systems with APC, this adjustment will be automatic.
Содержание MAX-Q+
Страница 1: ......
Страница 2: ......
Страница 16: ......
Страница 22: ......
Страница 26: ......
Страница 31: ......
Страница 32: ......
Страница 33: ......
Страница 34: ......
Страница 35: ......
Страница 36: ......
Страница 37: ......
Страница 38: ......
Страница 40: ......
Страница 41: ......
Страница 42: ......
Страница 45: ......
Страница 46: ......
Страница 47: ......
Страница 50: ......
Страница 51: ......
Страница 52: ......
Страница 53: ......
Страница 54: ......
Страница 55: ......
Страница 56: ......
Страница 57: ......
Страница 58: ......
Страница 62: ......
Страница 72: ......
Страница 87: ......
Страница 108: ......
Страница 113: ......
Страница 115: ......
Страница 117: ......
Страница 122: ......
Страница 130: ......
Страница 136: ......
Страница 137: ......
Страница 138: ......
Страница 139: ......
Страница 140: ......
Страница 141: ......
Страница 142: ......
Страница 143: ......
Страница 144: ......
Страница 145: ......
Страница 146: ......
Страница 147: ......
Страница 148: ......
Страница 149: ......
Страница 150: ......
Страница 151: ......
Страница 152: ......
Страница 153: ......
Страница 154: ......
Страница 155: ......
Страница 156: ......
Страница 157: ......
Страница 158: ......
Страница 159: ......
Страница 160: ......
Страница 161: ......
Страница 162: ......
Страница 163: ......
Страница 164: ......
Страница 165: ......
Страница 166: ......
Страница 167: ......
Страница 169: ......