FB Jets T33 Скачать руководство пользователя страница 11

 

 

FEI BAO/FB Jets Large T33 

Step 7: Horizontal Stabilizers 

 

The  horizontal  stabs  build  up  in  a  similar  fashion  to  the  vertical  stab  in  terms  of  the  servo 
installation.  Install your servos in the space provided and modify slightly as required if your 
selected servo does not fit.  Repeat all steps, including the installation of the servos. 

 

Before  installing  the  servos,  use  your  Matchmaker  or  equivalent  to  centre  the  servos  and 
match the positions of the control arms. 

 

Remember that the servos are mount reverse but need to move the same which required 
either a matchbox servo matching in the powerbox. 

 

If you are using JR Heavy Duty Arms and the positions don’t match, try rotating one arm 180 
degrees before deciding which half of the arm to trim off. 

 

Install the elevator servos into each tailplane and connect to the control arm attached to 
the elevator mechanism.  

 

This is an important step to ensure that the installation is tight and all screws and fasteners 
are tight and installed with Loctite.  

 

Do not use the rubber grommets as they may cause flutter if there is too much play.  

 

Attach a 36" heavy-duty 22-gauge extension to each servo. Heat shrink the connections for 
safety. 

 

Copy these steps for the other elevator and then centre and match both elevators to the 
RX system.   

 

Run  the  elevator  servo  extensions  from  the  rear  of  the  fuse  forward.    I  tend  to  run  these 
extensions  and  the  rudder  extension  lead  through  a  Teflon  tube  for  heat  protection  from 
the thrust tube. With the ceramic Teflon tubing, the servo wires will be protected from heat 
and abrasion for the life of the model. 

 

With  control  arms  in  the  vertical  position  and  the  control  surface  centred,  adjust  the 
linkages to the proper length for both elevators and the rudder.

 

 

With the two elevator servos activated through the Matchmaker, set the length of control 
linkage  such  that  the  elevators  are  equally  cantered  and  attach.  Make  sure  not  to  over 
tighten the bolts such that the arm binds.

 

 

Step 9: Speed Brake Setup 

 

I setup the speed brakes at this stage.  Do this while before you install the engine. 

 

 

Setup the air ram connected to your dual action air valve.  I used a dual action Xicoy air 
valve  for  simplicity,  however  the  manual  valve  supplied  with  the  kits  is  perfect  for  this 
function. Using this valve, operate the air ram to ensure all function is working.

 

 

Re-install the air ram into the holder and mount as pictured above and secure.

 

 

Attach it to the Speed brake function and test the ram using the manual valve to setup.

 

 

Check  that  the  Speed  brake  opens  and  closes  nicely  with  appropriate  pressure  to  stay 
closed. 

 

 

Step 10: Engine and Pipe 

 

Clean the fuselage thoroughly before installing the engine. If you need to trim the intake for 
engine clearance, use a vacuum while you work. This will reduce the chance of a foreign 
object finding its way into your engine later on the first run; 

 

Drill a hole in the thrust pipe mounting tabs at their mid-point.  

 

Position the pipe on the rear of the lower bypass. The tabs are slightly offset to one side of 
the pipe this is the top. 

 

With  the  pipe  fully  on  the  lower  bypass,  and  the  mounting  tabs  equally  spaced  from  the 
top,  drill  holes  through  the  engine  block  mount  and  attach/secure  the  pipe  tabs  to  the 
block.  If needed glue additional ply blocks for greater support of the pipe. 

 

Note that for additional support we have placed two Stainless Steel pop rivets through the 
front of the thrust tube and the rear of the by-pass.  

 

Install  the  engine  now  on  the  mounting  rails.    Using  a  Kingtech  k170,  we  did  not  have  to 
make any adjustments at all to the engine mounting rails.  If you are putting a Jetcat in your 
model, the additional Jetcat engine rails are provided    

 

These were perfect and the engine centred perfectly in the trust tube.  

Содержание T33

Страница 1: ...FEI BAO FB Jets Large T33 FB Jets Feibao T33 Construction Manual Written by Tyson Dodd in Collaboration with Fei Bao Jets ...

Страница 2: ...erienced modeller go over your installation after assembly A second set of eyes may spot a problem you have missed If you have not flown a model like this before it is HIGHLY recommended that you get an experienced turbine pilot to do your maiden flight Very often the first few seconds of a maiden flight are critical until the aircraft is trimmed out and having an experienced pilot at the controls...

Страница 3: ... 3 Tank Installation 7 Step 4 Nose gear 7 Step 5 Nose Doors 8 Step 6 Vertical Fin and Rudder 9 Step 7 Horizontal Stabilizers 11 Step 9 Speed Brake Setup 11 Step 10 Engine and Pipe 11 Step 12 Main Landing Gear and Doors 12 Step 13 Aileron and Flap Servos 13 Step 15 Cockpit 15 Step 16 Radio Programming 15 Step 17 Weight and Balance 15 Step 18 Test Flight 15 Equipment Installation Photos 16 ...

Страница 4: ... be A good example is in the hinges or control horn using regular epoxy a good portion of the glue will migrate down away from the hinge into the inside of the wing as it dries and you won t even know it is happening Hysol stays where you put it The downside of Hysol is it takes overnight to dry properly but we have tried to arrange things to keep you busy while waiting for glue to dry We also hig...

Страница 5: ...sto fuel shutoff valve 2 Wire twist tie optional Blue Loctite Red Loctite Glues Thin CA 30 minute epoxy Hysol Electronic gear sequencer I have used REECB Sequencer and 2 dual action valves for the retracts doors and brakes Or Brake valve Batteries regulator and switch Matchboxes Powerbox Smartfly EQ10 or Spectrum Power Safe I have utilised a JR 12 channel RX with a Power box competition dual regul...

Страница 6: ...ead screw and remove the stopper assembly from the tank Use a small round Perma Grit rat tail file or a knife to remove the excess metal You will need to inspect the ends of all tubes and ensure that there are no loose filings When finished make sure to blow out the metal fragments and clean up any sharp edges While the components are apart check the Tygon pickup line for equal lengths in both sad...

Страница 7: ...ank to the optional UAT or to the fuel pump I have located the UAT at the front of the component board which has worked well with the balance of the model as the UAT should always be full o IMPORTANT if you are going to establish the saddle tanks in parallel ensure ALL the lengths of fuel tubing are identical length for both tanks to both the t pieces for the vent and fuel in and the clunk pickups...

Страница 8: ...the glue however as you may want to remove the tanks in the future When the glue is dry run air system lines to the tanks In our T33 all air and fuel fill lines are run to the front hatch of the airframe together with the fuelling points etc for easy of service Layout the air system components on the front or rear board and then bolt the board into place with four small wood screws Your layout on ...

Страница 9: ...in method The servos for the rudder and elevator fit nicely into both the fin and the tailplane making it easy for you to install the servo arms and pushrods together with the control horns Trial fit the rudder into the vertical stab and makes sure the screw pin is securely fitted When we installed the rudder servo we marked the cut in the fin that we needed to make for the rudder servo arm to mov...

Страница 10: ... will help prevent a mishap Roughen the surface of the control arm where it will glue into the rudder with 100 grit sandpaper Tape around the slot with masking tape and apply a liberal amount of Aeropoxy or Hysol into the slot to ensure it is secure but with no glue on your surfaces Locate lock clamp in the fuse rear section and slide the fin into place while routing the servo wire through the hol...

Страница 11: ...tivated through the Matchmaker set the length of control linkage such that the elevators are equally cantered and attach Make sure not to over tighten the bolts such that the arm binds Step 9 Speed Brake Setup I setup the speed brakes at this stage Do this while before you install the engine Setup the air ram connected to your dual action air valve I used a dual action Xicoy air valve for simplici...

Страница 12: ...or the cockpit above the component board at the front of the fuse Resist the temptation to hide wires away under the component boards as it will make future maintenance more difficult Keep things neat but accessible Step 12 Main Landing Gear and Doors Extend main gear and unscrew and move to once side Put a drop of thin CA into each screw hole to strengthen the ply in the area of the bolts If not ...

Страница 13: ...is step before trimming off the unused side of the arm The ailerons will already be fitted to your plane with the screw pin hinging A small flat screw drive and do this then fingers Position the servos onto the mounting tabs paying attention to the position of arm relative to the control horn slot marked on the control surface Using great care not to pierce through the top of the wing drill and bo...

Страница 14: ...prints or excess glue on the wing surfaces cigarette lighter fluid will help remove fingerprints When the glue has cured install the linkages Insert the wing tips into the mounting holes When the pins are fully inserted tighten the locking clamp bolts through the small holes in the top of the fuse If you are installing navigation lighting do this now before you permanently install the wing tips Ph...

Страница 15: ...can be removed for charging if required We used 2 4000mAh 7 4v Lipo s for the RX and a 7 4 4000mAh for the Turbine ECU Set your radio for the following throws Ailerons 25 30 mm in either direction Elevators 25 30 mm in either direction Rudder max throw allowable for nice controlled knife edge manoeuvres Step 17 Weight and Balance Test fuel the aircraft Check for leaks then drain Set your CG For th...

Страница 16: ...eivers and 2 4 GHZ units due to the central location high mounting point and absence of carbon fibre in the area If you are using multiple 2 4 receivers this general location allows for additional units both fore and aft The positioning also allows for the shortest run of extension wires Parts List Forward Fuselage and Component Boards Aft Fuselage Engine Hatch Canopy Horizontal Stabs Elevators 2 ...

Страница 17: ...FEI BAO FB Jets Large T33 ...

Страница 18: ...FEI BAO FB Jets Large T33 ...

Страница 19: ...FEI BAO FB Jets Large T33 ...

Отзывы: