25
(200 mm) should be sufficient. Connect the vent from the saddle tanks to a bulkhead vent
fitting located on the bottom of the fuselage, the fitting should be located between on of the
intake ports to provide protection in case of a gear up landing, see photo 47.
Connect a length of tubing that will run to UAT to the fuel pickup tube on the main center
tank.
Safety wire all connections at this time.
If you use plastic wire ties (Tyraps) to bind the fuel tubes together for a neater installation,
make sure not to over-tighten and pinch down on the flexible fuel tubing.
For a series connected saddle tank system run a length of tubing from pick-up line of one
saddle tank to the vent line of the other. Then run a length of tubing from the pick-up of the
second tank to the vent of the main tank, see photo 48. The main vent from the first tank in
the series line should be run to the fitting exiting the airframe on the bottom. See Photo 47
Photo 47
Photo 48
Содержание FEI BAO
Страница 20: ...20 Photo 36 Photo 34 Photo 35 ...
Страница 27: ...27 Photo 49 Photo 51 Photo 50 ...
Страница 28: ...28 Photo 52 Photo 53 Photo 54 ...
Страница 29: ...29 Photo 56 Photo 55 Spacer ...
Страница 31: ...31 Photo 59 Photo 58 Photo 60 ...
Страница 32: ...32 Photo 61 Photo 62 Photo 63 ...
Страница 39: ...39 Photo 76 Photo 77 Photo 78 ...
Страница 40: ...40 Photo 79 Photo 80 ...
Страница 42: ...42 Photo 82 Photo 83 ...
Страница 45: ...45 Photo 89 Photo 88 ...
Страница 49: ...49 Photo 94 Photo 95 Photo 96 ...
Страница 54: ...54 Congratulations you have completed construction of your Fei Bao Rafale ...