36
Step 8: Main Landing Gear
Install airlines on the retract units.
Check for air leaks and smooth operation of the retracts with a hand pump as done in
section 7, see photo 66.
Install main struts into the door retract cylinders.
Working carefully to make sure the retract unit stays in this position and aligned equally to
either side of the gear opening, drill one of the holes closest to the forward former. Insert a
bolt into the hole to hold this position see photo 73.
Proceed to drill the other three holes, making sure to maintain alignment of the gear. Insert
a bolt in each hole as it is drilled.
Photo 73
Photo 72
Содержание FEI BAO
Страница 20: ...20 Photo 36 Photo 34 Photo 35 ...
Страница 27: ...27 Photo 49 Photo 51 Photo 50 ...
Страница 28: ...28 Photo 52 Photo 53 Photo 54 ...
Страница 29: ...29 Photo 56 Photo 55 Spacer ...
Страница 31: ...31 Photo 59 Photo 58 Photo 60 ...
Страница 32: ...32 Photo 61 Photo 62 Photo 63 ...
Страница 39: ...39 Photo 76 Photo 77 Photo 78 ...
Страница 40: ...40 Photo 79 Photo 80 ...
Страница 42: ...42 Photo 82 Photo 83 ...
Страница 45: ...45 Photo 89 Photo 88 ...
Страница 49: ...49 Photo 94 Photo 95 Photo 96 ...
Страница 54: ...54 Congratulations you have completed construction of your Fei Bao Rafale ...