8.8.2 Checking, adjusting the valve clearance
Perform this maintenance work at the latest after
250 operating hours
NOTICE!
Danger of engine damage!
We recommend to have this work carried out by
trained personnel or our after sales service.
–
Before checking the valve clearance let the
engine cool down.
Protective equipment:
n
Working clothes
n
Protective gloves
1.
Park the machine in secured condition
‘Parking the machine in secured condition’ on page 61
2.
Let the engine cool down to 20 °C (68 °F).
3.
Unscrew the fastening screws (1).
4.
Remove valve cover (2) with seal (3).
5.
Set the piston to the top dead centre position of the compres-
sion stroke.
For this purpose align the alignment mark (2) on the starter
disc to the top bore (1).
Preparations
Fig. 83
Fig. 84
Maintenance – Annually
DRP15X
82
Содержание DYNAPAC DRP15X
Страница 6: ...Table of contents DRP15X 6 ...
Страница 7: ...1 Introduction Introduction DRP15X 7 ...
Страница 11: ...2 Technical data Technical data DRP15X 11 ...
Страница 15: ...3 Concerning your safety Concerning your safety DRP15X 15 ...
Страница 39: ...4 Indicators and control elements Indicators and control elements DRP15X 39 ...
Страница 45: ...5 Checks prior to start up Checks prior to start up DRP15X 45 ...
Страница 53: ...6 Operation Operation DRP15X 53 ...
Страница 62: ...Operation Parking the machine in secured condition DRP15X 62 ...
Страница 63: ...7 Loading transporting the machine Loading transporting the machine DRP15X 63 ...
Страница 68: ...Loading transporting the machine Transport wheels DRP15X 68 ...
Страница 69: ...8 Maintenance Maintenance DRP15X 69 ...
Страница 109: ...9 Troubleshooting Troubleshooting DRP15X 109 ...
Страница 116: ...Troubleshooting What to do if the engine has flooded DRP15X 116 ...
Страница 117: ...10 Disposal Disposal DRP15X 117 ...
Страница 119: ......
Страница 120: ......