-37-
▣ Change the motor cable position
The motor cable can change to one of three 90 degrees directions.
6.4.4 Installing
▣ Install direction
Hollow shaft gearhead can be installed by using either its front or rear side as the mounting
surface.
▣ Install method
• Gearhead do fix with the supplied hexagonal socket head bolt set to the metal machining flat
plate.
• When installing gearhead, please make mounting holes in the metal machining flat plate.
• Install the supplied hexagonal socket head bolt set in the four mounting holes you opened and
tighten the nuts until no gaps remain between the motor and mounting plate.
• Attached the supplied safety cover to the hollow shaft on the end opposite from the one where
the load shaft is installed.
Содержание Ezi-SPEED ESD-30-C
Страница 1: ......
Страница 9: ...9 2 Characteristics 2 1 Part number...
Страница 15: ...15 3 2 Dimensions 30W 60W 120W Drive 200W 400W Drive...
Страница 18: ...18 ESM 90 H 120 ESM 104 H 200 ESM 104 H 400...
Страница 19: ...19 4 3 Characteristics of motor torque 30W 60W 120W...
Страница 20: ...20 200W 400W...
Страница 63: ...63 8 2 Setting and 7 segments display 1 Monitor mode...
Страница 64: ...64 2 Input Output setting mode...
Страница 65: ...65 3 Parameter setting mode 1page...
Страница 66: ...66 3 Parameter setting mode 2page...
Страница 67: ...67 3 Parameter setting mode 3page...
Страница 68: ...68 3 Parameter setting mode 4page...
Страница 69: ...69 4 NVM saving mode...