Installation
Installation instructions Sauna control Series FCU2x00/FCU3x00/FCU4x00 / Version V 2.18
23
Installation of
the double flush
mounted socket
Installation opening of the flush mounted socket for installation of the internal display:
Fig. 10: Mounting hole of the double flush mounted socket
1-2: Drill with box drill
3-4: Saw out the left standing center bars with a jigsaw
Electrical
Connection
Connect the RJ45-connector of the internal display with a patch cable to the control
device.
Electrical
connection
diagram
Figure 11: Connection interior display
The electrical lines for FCU-EXT-DISPLAY(-TOUCH) und FCU-DESIGN are plugged on
top of each other in the Double-RJ45-Connector. Which lines will be put up or down
does not matter. Both sockets are the same.
Содержание FCU2000 Series
Страница 37: ...Notes Installation instructions Sauna control Series FCU2x00 FCU3x00 FCU4x00 Version V 2 18 37 Notes...
Страница 38: ...Notes 38 Installation instructions Sauna control Series FCU2x00 FCU3x00 FCU4x00 Version V 2 18...
Страница 39: ...Notes Installation instructions Sauna control Series FCU2x00 FCU3x00 FCU4x00 Version V 2 18 39...
Страница 40: ...Address of the contractor installer or the dealer of the sauna unit...