background image

GROWSPAN

 GOTHIC PRO GREENHOUSES AND SYSTEMS

26

113836_37_38_39DD    Revision date: 06.06.18

SET HEIGHT OF DROP-DOWN SIDE PANEL

The desired height for drop-down side panel is determined and marked 

before

 installing polycarbonate roof panels. 

 

ATTENTION:

 Consult Main Cover Details diagram in the Quick Start section of this manual to verify height of drop-down 

panel.  

 

Required distance from finished grade to bottom of roof panels is 42".

  

1.  Measure and mark the height of drop-down side panel at 42" on the end rafter at one end of the greenhouse.

2.  Move to opposite end of the greenhouse (same side) and mark same height from finished grade on that end rafter. 
3.  Stretch a chalk line along the side between the two points. Use a line level to ensure marks are level.
4.  Snap to mark bottom edge of polycarbonate roof panels. 
5.  Continue by installing roof panels.

42"

Customer-Supplied Baseboard

Ground Level

Содержание Growers supply GrowSpan Gothic Pro 113836DD

Страница 1: ...H x 28 L 113837DD 20 W x 12 H x 36 L 113838DD 20 W x 12 H x 48 L 113839DD 20 W x 12 H x 72 L Photo may show a different but similar model Polycarbonate Roof with 5 2 oz Drop Down Side Panels 2018 Grow...

Страница 2: ...the proper location is an important step before you begin to assemble the structure The following suggestions and precautions will help you determine whether your selected location is the best locati...

Страница 3: ...tall polycarbonate panels 13 Install drop down side panels 14 Read the care and maintenance information at the end of these instructions POLYCARBONATE PANELS Do not allow panels to remain in direct su...

Страница 4: ...ing the FA4652 supplied fasteners End Panel of Shelter Curtain Panel Ground Level Baseboard and Retaining Board The diagram shows a customer supplied ribbon board as attached to the frame Rafter 2 x 6...

Страница 5: ...Round Tube Connect Bracket 102856 End Clamp FAH009B FALB01B Carriage Bolt Hex Nut 103496 Gearbox 104624 Square Tube Fitting QH1330 Angle Bracket 104213 Aluminum U Channel Profile 104548 End Cap Profil...

Страница 6: ...H channel does not allow channel side out installation Use the diagrams on this page to install H channel with flat side facing out ATTENTION Use only 1 1 2 Tek screws to attach H channel to building...

Страница 7: ...d Rafter Interior Rafter Baseboard is supplied by customer Finished Grade Purlins Ground Post GrowSpan Gothic Pro Greenhouses and Systems OVERVIEW See illustration below to identify main parts of gree...

Страница 8: ...the length center to center and drive the next corner ground post 6 Repeat the same step for the last corner post NOTE Distance measured diagonally between corner posts must be equal for building to...

Страница 9: ...ps for side struts are installed when the two 2 end rafters are set onto the ground posts 1 Select the five 5 pipes needed to assemble the first end rafter and arrange on a level surface 2 Slide four...

Страница 10: ...Instead cross connectors are attached during the frame assembly 2 Insert swaged ends of rafter pipes into plain ends and secure each joint with an FA4482B Tek screw NOTE For longer frames it may be ea...

Страница 11: ...to ground posts using 5 16 x 2 1 2 FAG336B bolts and nuts FALB02B Use the top hole in ground post to secure rafter Rafter shown differs in design ATTENTION Stand the rafter so the nuts and bolts of th...

Страница 12: ...cross connector Interior Rafter Purlin 11 Secure cross connector to rafter and to purlin using FA4482B Tek screws See details in Quick Start section if needed 12 Repeat Steps 6 12 to install the first...

Страница 13: ...uilding length Materials for baseboards are supplied by the customer Fasteners to secure baseboards to frame are included with building A baseboard 2 x 6 minimum provides a mounting surface for lower...

Страница 14: ...frame If no baseboard is present attach strut to ground post using a FA4484B Tek screws or other customer supplied fasteners 4 Repeat above steps to attach the remaining side struts 5 After securing s...

Страница 15: ...labeled as NON CRITICAL on end frame diagrams when deciding where to install the additional horizontal framing for accessories Consult the diagrams in the Quick Start section showing the polycarbonate...

Страница 16: ...9 tube 9 Measure the required length for the door frame tube NOTE Length is measured between top of base tube and band clamp Step 7 on rafter 10 On assembled frame member mark length determined in Ste...

Страница 17: ...n FA4482B Tek screw through the back side of each door frame tube to secure the tube splice 19 Choose a 102897 tube for door header and cut length to the width of rough door opening Cut off part of sw...

Страница 18: ...not tighten 31 Verify that frame member is plumb and use FA4482B Tek screws to secure 104624 fitting to base tube and frame member 32 Tighten band clamp and install an FA4482B short Tek screw through...

Страница 19: ...If back wall does not include an optional double door kit consult the end frame diagram to install the vertical frame tubes in the framed door opening Dashed lines show where additional frame tubes a...

Страница 20: ...ith white vent tape Consult polycarbonate panels Quick Start section for the location and lengths of each panel The diagrams are located near the back of these instructions ATTENTION Panels must be po...

Страница 21: ...differ Continue installing panels and aluminum profile in the locations shown on the end panel diagrams Quick Start section for the front and back end walls U channel profile 104213 is also installed...

Страница 22: ...needed Install panels with UV protected side to the outside toward the sun 5 Center the panel on the door frame 6 Use FA4484B Tek screws and neo bonded galvanized washers to attach panel to horizonta...

Страница 23: ...other door Locations of door hinges may vary 13 At top and sides of end wall door opening on the inside of the frame attach end cap 104548 and allow it to extend below header and into the frame openi...

Страница 24: ...e inside frame of the door that includes the chain latch Diagram may show a different frame used for illustration purposes only NOTE This section of end cap acts as a stop for the remaining door of th...

Страница 25: ...el overlaps lower panel by six 6 inches 4 Install ridge cap 5 Repeating Steps 1 3 work toward other end of frame until all panels and ridge cap sections are installed 6 Attach aluminum profile to lowe...

Страница 26: ...drop down panel Required distance from finished grade to bottom of roof panels is 42 1 Measure and mark the height of drop down side panel at 42 on the end rafter at one end of the greenhouse 2 Move t...

Страница 27: ...protected side and remove protective film NOTE Mark UV protected side using a piece of tape or other means to ensure side is installed toward the sun 2 Apply vent tape 104774 to cover one end of panel...

Страница 28: ...e side Adjust rafters as needed Duct tape can be used in small pieces to hold H channel in place along panel edges Do not allow to work loose during installation H channel to remain tight to panel edg...

Страница 29: ...H channel from top Review diagrams below for another way to install lower panels a After installing lower panels of first frame bay prepare the next lower panel as previously described but do not atta...

Страница 30: ...inside and outside the frame carefully set panel on frame and overlap top of lower panel by 6 17 Align panel and center H channel with center of end rafter and first interior rafter 18 Secure panel to...

Страница 31: ...ap 23 Attach ridge cap to 104548 end cap using FA4484B Tek screws and 102921 neo bonded washers Repeat to secure remaining side of ridge cap 104548 end cap cut to fit between rafters inside frame Tek...

Страница 32: ...all upper panels Solid line shows lower end of all upper panels dashed line shows upper edge of all lower panels which is capped with foil tape during panel preparation X X Step 24 25 Step 26 A IMPOR...

Страница 33: ...ngth of 1 5 x 1 5 tube Diagram shows installed panels as seen standing inside greenhouse 4 From inside the frame align square tube as shown over lower end of upper panel dashed line Hold tube in place...

Страница 34: ...le shown Inside Greenhouse Outside Greenhouse 104213 U Channel Lower Panel 104779 Backer Tube inside greenhouse Upper Panel FA4484B Tek Screw 102921 Neo Bonded Washer FRAME CHECK Before you attach the...

Страница 35: ...to secure curtain when it is in the up or closed position Ribbon Board Baseboard Rafter 2 x 6 Board 1 x 4 Board FA4652 Wood Screws 1 4 x 4 Carriage Bolts Polycarbonate Panel RIBBON BOARD INSTALLATION...

Страница 36: ...the plate mounting holes with the center of the end rafter 3 Mark plate mounting hole locations and drill the holes Use a 1 4 drill bit for the mounting holes 103544 Mounting Plate Figure 1 Actual mou...

Страница 37: ...carriage bolts 1 4 lock nuts and 1 4 flat washers NOTE Cover is not shown in the above diagram Diagram shows gearbox mounted to the end rafter on the outside of the end wall cover 12 Move inside the...

Страница 38: ...talling all sections of axle conduit for the first drop down curtain assembly verify that the axle conduit is level and that each conduit splice is secured with a Tek screw Step 14 19 Move to the gear...

Страница 39: ...ide of the frame 4 Continue installing wood screws washers and pulleys into the ribbon board next to each rafter until all pulleys are installed along both sides of the shelter 5 Install the curtain c...

Страница 40: ...8 section to the first plain end over tapered swaged end and tape the conduit joint using duct tape 4 Continue adding conduit sections and taping each joint until the conduit is as long as the curtai...

Страница 41: ...Tek screws as shown and tighten the screws to secure the cord to the axle 16 Move to the next pulley position and repeat the steps to measure cut and attach another cord to the curtain and axle condui...

Страница 42: ...d CAUTION Do not attempt to attach the curtain to the baseboard during stormy or windy conditions or when such conditions are expected 1 Using the supplied crank handle roll the curtain panel up to wi...

Страница 43: ...ye screw to either the baseboard or ribbon board depending on pattern 3 Continue installing eye screws until you reach the other end rafter and finish installation by repeating Step 1 4 Install eye sc...

Страница 44: ...U channel 5 Seal upper edge of both end walls with a bead of sealant See dashed line in diagram below Frame shown may differ from actual frame 6 Seal joint where ridge cap and panel meet if this was n...

Страница 45: ...t accumulate on greenhouse Use tools that will not damage panels cover when removing debris Remove snow to prevent excess accumulation Use tools that will not damage polycarbonate panels when removing...

Страница 46: ..._39DD Revision date 06 06 18 QUICK START GUIDE 20 Gothic Pro Greenhouse Frame shown may differ in length from actual frame Finished Grade Finished Grade Shelter Height 11 11 5 8 4 5 Sidewall 20 0 Shel...

Страница 47: ...401D 20G166SS401D PURLIN CONNECTION SEE CONNECTION NOTE 20G166SS403 PURLIN CONNECTION SEE CONNECTION NOTE 166S064 PURLIN CONNECTION SEE CONNECTION NOTE 166S064 PURLIN CONNECTION SEE CONNECTION NOTE 10...

Страница 48: ...EMS 48 113836_37_38_39DD Revision date 06 06 18 SIDE PROFILE 113836 Baseboards Supplied by Customer 28 0 Shelter Length 4 0 Rafter Spacing 131S075 131S075 131S075 131S075 131P0495 4 Runs of Pipe Assem...

Страница 49: ...MS Revision date 06 06 18 113836_37_38_39DD SIDE PROFILE 113837 Baseboards Supplied by Customer 36 0 Shelter Length 4 0 Rafter Spacing 131S075 131S075 131S075 131S075 131P0735 131S075 4 Runs of Pipe A...

Страница 50: ...6_37_38_39DD Revision date 06 06 18 SIDE PROFILE 113838 48 0 Shelter Length 4 0 Rafter Spacing 131S075 131S075 131S075 131S075 131P0735 4 Runs of Pipe Assembly Used for Purlin runs 131S075 131S075 131...

Страница 51: ...8 113836_37_38_39DD SIDE PROFILE 113839 Baseboards Supplied by Customer 72 0 Shelter Length 4 0 Rafter Spacing 131S075 131S075 131S075 131S075 131P0735 131S075 131S075 131S075 131S075 131S075 131S075...

Страница 52: ...ONS RAFTER GROUND POST VIEW 7 VERTICAL HORIZONTAL CONNECTION VIEW 4 PURLIN MID RAFTER CONNECTION VIEW 1 RAFTER STRUT CONNECTION VIEW 6 PURLIN END RAFTER CONNECTION VIEW 2 RAFTER ENDWALL CONNECTION VIE...

Страница 53: ...LL COLUMN RAFTER CHORD RAFTER CHORD TEK SCREW 14 X 1 RAFTER CHORD CONNECTION RAFTER STRUT VIEW 6 STRUT QH1304 QH1402 104675 1X 5 16 X 2 1 2 HEX BOLT RAFTER CHORD 1X 5 16 NUT ADDITIONAL HOLE FOR CUSTOM...

Страница 54: ...4 INSIDE DIM 48 C L C L 98 1 4 C L C L 48 C L C L 22 7 8 C L C L 22 7 8 C L C L 48 C L C L 25 1 8 C L C L VIEW 1 VIEW 3 VIEW 2 NOTE COLUMNS NOT DIMENIONED HAVE A NON CRITICAL PLACEMENT AND ARE USED F...

Страница 55: ...55 GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS Revision date 06 06 18 113836_37_38_39DD CONNECTION END WALL DETAILS...

Страница 56: ...AME DIAGRAM 48 C L C L 22 7 8 C L C L 25 1 8 C L C L 47 15 16 C L C L 25 1 8 C L C L 22 7 8 C L C L 48 C L C L NOTE COLUMNS NOT DIMENIONED HAVE A NON CRITICAL PLACEMENT AND ARE USED FOR POLYCARBONATE...

Страница 57: ...H channel does not allow channel side out installation Use the diagrams on this page to install H channel with flat side facing out ATTENTION Use only 1 1 2 Tek screws to attach H channel to building...

Страница 58: ...06 06 18 POLYCARBONATE PANELS FRONT WITH DOORS H CHANNEL U CHANNEL USE 4 X 8 PANEL TO COVER A B 4 X 8 POLY 4 X 8 POLY ONE HALF 4 X 8 POLY 6 X 10 POLY 4 X 8 POLY ONE HALF 4 X 8 POLY 6 X 10 POLY PANEL...

Страница 59: ...ate 06 06 18 113836_37_38_39DD H CHANNEL USE 4 X 8 PANEL TO COVER A B 6 X 10 POLY 4 X 8 POLY 4 X 8 POLY 4 X 8 POLY 4 X 8 POLY 6 X 10 POLY PANEL B PANEL A NOTE INSTALL UV PROTECTED SIDE OF PANEL TO THE...

Страница 60: ...ion date 06 06 18 MAIN COVER DETAILS FINISHED GRADE 104213 4 6 Overlap R a f t e r H C h a n n e l P o l y c a r b P o l y c a r b 1 0 4 2 1 3 Upper Panel Use one 1 116049 47 1 4 x 96 Cut to Fit Lower...

Страница 61: ...61 GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS Revision date 06 06 18 113836_37_38_39DD...

Отзывы: