![FarmTek Growers supply GrowSpan Gothic Pro 113836DD Скачать руководство пользователя страница 42](http://html1.mh-extra.com/html/farmtek/growers-supply-growspan-gothic-pro-113836dd/growers-supply-growspan-gothic-pro-113836dd_installation-instructions-manual_4592720042.webp)
GROWSPAN
™
GOTHIC PRO GREENHOUSES AND SYSTEMS
42
113836_37_38_39DD Revision date: 06.06.18
Diagram shows cords attached to the curtain conduit
and to the axle. Dashed line shows the position of the
curtain conduit. Roof panels are not show for clarity.
18. Continue by attaching the lower curtain edge to the
baseboard for the first curtain installation.
Cord
INSTALL THE DROP-DOWN CURTAIN (continued)
Panel Pocket with Conduit
17. Repeat the above steps until all cords are attached to
the first curtain panel along one side of the shelter.
Attach Curtain to Baseboard
Use customer-supplied dimension lumber for retaining
board. Retaining board must be
at least 1" x 2"
to
adequately secure curtain to baseboard. See the diagram
below for an example.
Diagram may show a different frame and curtain assembly.
End Panel of Shelter
Curtain
Panel
Ground Level
Baseboard and
Retaining Board
The retaining board secures curtain to baseboard.
Use
FA4652 wood screws (included) to secure retaining board
to baseboard.
Evenly space wood screws at 16".
Complete these steps to attach the lower edge of the
curtain to the customer-supplied baseboard.
CAUTION:
Do not attempt to attach the curtain to the
baseboard during stormy or windy conditions or when
such conditions are expected.
1. Using the supplied-crank handle, roll the curtain panel
up to within 2" of where it will seat into the channel
created by the two-piece ribbon board.
2. Move to the bottom of the panel and with assistance,
evenly stretch the panel end-to-end along the
baseboard.
3. Take the first section of customer-supplied retaining
board and place it against the curtain and the
baseboard to hold the curtain in position.
NOTE:
Evenly and gently pull the curtain edge down to
remove wrinkles.
Applying too much force will bend the
curtain conduit.
4. Using the supplied FA4652 fasteners, secure the
retaining board to the baseboard as shown.
5. Repeat the steps to secure the remaining lower edge of
the curtain to the baseboard along the side.
6. Return to the gearbox and check the operation of the
drop-down curtain panel using the crank handle. Adjust
cords as needed for a level curtain.
7. Repeat the steps to attach the remaining curtain to the
other side of the building.
8. Install the anti-billow rope.
Rafter
Cord secured
to Axle
Curtain Conduit
in Curtain
1"– 2"
1" x 4"
Board
Retaining Board
Curtain Panel
End Panel of Shelter
Lower Edge of
Curtain Panel
Space FA4652
screws at 16" oc.
Outside View