33
GROWSPAN
™
GOTHIC PRO GREENHOUSES AND SYSTEMS
Revision date: 06.06.18 113836_37_38_39DD
INSTALL OVERLAP BRACING AND U-CHANNEL
View from
outside.
Upper Panel
Lower Panel
Install 8' aluminum
profile here along edge
of upper panel.
Upper
Panel
Aluminum profile attached
to bottom of upper panel
(outside of frame).
Lower Panel
Foil tape at top of lower panel.
Complete this procedure to finish panel installation:
1. Install 8' sections of aluminum profile (104213) along
lower edge of all upper panels on both sides. Trim last
section to length as needed.
NOTE:
Install long side of
profile on top of panel.
Do not use Tek screws or
washers when installing
aluminum U-channel at this
time.
104213 U-Channel
Long Side
of Profile
2. Move inside the frame and measure between rafters at
point where upper and lower panels overlap.
3. Cut a piece of 104779 (1.5" x 1.5") square tubing to fit
between rafters. (All tubes should be same length.)
NOTE:
Diagram (above) shows where to measure to
determine length of 1.5" x 1.5" tube. Diagram shows
installed panels as seen standing inside greenhouse.
4. From inside the frame, align square tube as shown
over lower end of upper panel (dashed line). Hold tube
in place tight against panel.
1.5" x1.5" Tube
(104779)
View from inside the shelter.
Foil tape at top of lower panel.
ATTENTION:
Align and install tube as shown to secure
upper and lower panels together at overlap seam.
View shows underside of panels as seen from inside
greenhouse.
IMPORTANT
:
Under no circumstances should a
support structure allow force or weight to be applied to
polycarbonate panels! Supports must span from rafter
to rafter when used. Consult a contractor if needed for
additional information. Take additional steps to protect
polycarbonate panel surface.
Use of a lift is strongly
recommended.
If bracing and U-channel trim were installed during
panel installation, skip this section and continue with the
installation of baseboards.
Foil Tape
(top of lower
panel inside)
Lower
Panel
1.5" x 1.5" (104779)
Backer Tube
(inside greenhouse)
U-Channel (bottom of
upper panel – outside)
Upper
Panel
Install 104213
U-channel here.
Dashed line shows
top of all lower panels
(inside greenhouse).