29
GROWSPAN
™
GOTHIC PRO GREENHOUSES AND SYSTEMS
Revision date: 06.07.18
The drop-down curtain requires a ribbon board to secure its
upper section and a baseboard to secure its lower section.
The materials for these components are not included and
are
supplied by the customer
.
BASEBOARDS AND RIBBON BOARDS
The example above shows the required ribbon board and
baseboard as attached to the frame.
ATTENTION:
Consult the Main Cover Details diagram in
the Quick Start section of this manual to determine where
to install the ribbon board.
The ribbon board consists of two runs of material; the first
is a 2" x 6" board attached to the building frame and the
second is a 1" x 4" board attached to the first board. These
boards, when assembled properly, provide a channel that
secures the curtain when it is in the up or closed position.
Boards are secured to the frame using the supplied
1/4" x 4" carriage bolts and to each other using the FA4652
supplied fasteners.
The diagram below shows a customer-supplied ribbon
board as attached to the frame.
Ribbon Board
Baseboard
FRAME CHECK AND CURTAIN PREPARATION
1. Attach the second board to the ribbon board using
FA4652 wood screws as shown in the diagram to the
left.
2. Verify that the baseboard is installed properly at ground
level. The baseboard must be level for the drop-down
curtain to install and function properly.
3. Gather the boards needed for the retaining board of the
baseboard. See diagram above.
4. Collect all drop-down curtain components and continue
with the curtain installation.
A customer-supplied baseboard and retaining board are
also required to attach the curtain's lower edge. See the
exploded view that follows.
The baseboard runs the length of the frame at ground level.
The retaining board secures the curtain to the baseboard.
The baseboard and retaining board are supplied by the
customer.
Fasteners (1/4" x 4" carriage bolts and FA4652 wood
screws) are included. Depending on board width, use 2
carriage bolts per rafter connection for the baseboard and
ribbon board. Evenly space the wood screws at 24".
Rafter
2" x 6" Board
1" x 4" Board
FA4652
Wood
Screws
1/4" x 4"
Carriage
Bolts
U-Channel
End Panel of Shelter
Curtain
Panel
Ground Level
Baseboard and
Retaining Board
Secure
u-channel to
ribbon board
using FA4652
wood screws
spaced at 16"
on-center.
Содержание Growers Supply GrowSpan Gothic Pro 106306D
Страница 39: ...39 GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS Revision date 06 07 18 FRONT PROFILE ...
Страница 44: ...GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS 44 Revision date 06 07 18 CONNECTIONS ...
Страница 45: ...45 GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS Revision date 06 07 18 CONNECTION FRAME DETAILS ...
Страница 47: ...47 GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS Revision date 06 07 18 CONNECTION END WALL DETAILS ...
Страница 53: ...53 GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS Revision date 06 07 18 Page reserved for customer notes ...