GROWSPAN
™
GOTHIC PRO GREENHOUSES AND SYSTEMS
16
Revision date: 06.07.18
4. Secure the base tube between the legs of the end
rafter using an angle bracket and Tek screws.
INSTALL THE END WALL FRAME (continued)
The bracket
shown in this
diagram can
be installed
with either its
short section
(as shown) or
the long section
attached to the
ground post.
Base Tube
Ground
Post
5. On the base tube surface facing the inside of the
greenhouse, install a short Tek screw at each joint and
then locate and mark the center of the base tube.
6. Consult the End frame diagram (Quick Start section)
and mark the rough opening for the width of the double
door assembly.
7. Place the band clamps on the end rafter above the
door as shown below.
DO NOT TIGHTEN THE BOLTS
AT THIS TIME.
ATTENTION:
The frame shown below may differ from
the end wall frame. Consult the diagrams in the Quick
Start section to view the frame for this shelter.
8. Select the tubing for the two vertical frame supports for
the sides of the double door. Each support includes:
9. Measure the distance
between the top of the base tube
and band clamp (Step 7)
to determine the length of the
first vertical section of the door frame tube.
10. Choose one (1) square tube (#102897), insert the
swaged end of the long tube into the plain end of
another tube and tap with a hammer to properly seat
the tubes at the joint.
11. On this assembled frame member, mark the length
determined in Step 9 (above) and
subtract the amount
needed to account for the square-to-round tube
connect bracket
, which is attached to the top of the
frame tube. See the diagram that follows.
12. Select a square-to-round tube connect bracket and
attach the bracket to one end of the vertical frame
member. Use a 5/16" drill bit to drill a hole through the
tube and attach the bracket to the tube using a nut and
carriage bolt.
13. Repeat Steps 9-12 for the remaining vertical frame
member for the door.
14. With the square-to-round tube connect bracket
attached to the top of each vertical door frame tube,
use the bolt in the band clamp to attach the bracket to
the band clamp. DO NOT TIGHTEN AT THIS TIME.
NOTE:
The heads of the bolts for each clamp are to the
outside (or front/back) of the greenhouse. At this point,
the two vertical door frame members should be loosely
attached to the end rafter assembly.
• One (1) long 99" section of square tubing (#102897
swaged end)
• One (1) short section of square tubing. This is cut
from a swaged end tube (#102897).
• One (1) square-to-round tube bracket (#104074)
End Rafter
Square-to-
Round Tube
Connect
Bracket
Front (or outside)
of the greenhouse
Vertical Door
Frame Tube
Содержание Growers Supply GrowSpan Gothic Pro 106306D
Страница 39: ...39 GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS Revision date 06 07 18 FRONT PROFILE ...
Страница 44: ...GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS 44 Revision date 06 07 18 CONNECTIONS ...
Страница 45: ...45 GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS Revision date 06 07 18 CONNECTION FRAME DETAILS ...
Страница 47: ...47 GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS Revision date 06 07 18 CONNECTION END WALL DETAILS ...
Страница 53: ...53 GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS Revision date 06 07 18 Page reserved for customer notes ...