FARMTECH FPD 30 Скачать руководство пользователя страница 9

 

 

8

Operation

Detaching the Digger from the Tractor 

Raise the boom to allow the auger to hang  
vertically then lower it until the end rests on the 
ground.  Remove the PTO shaft and on hydraulic 
diggers disconnect the hydraulic hoses.  Move 
the tractor slowly forward whilst lowering the 
boom until the digger gearbox rests on the 
ground.  Stop the tractor and fully lower the  
linkage.  Disconnect the upper linkage pin then 
the lower pins.  It may be necessary to use a 
hoist to take the weight of the digger. 

Alternatively the digger can be removed with the 
PTO still attached to the gearbox by drilling the 
auger into the ground. 

Attaching Assembled Digger to the Tractor 

Position the digger with the PTO shaft removed 
and gearbox and auger on the ground behind the 
boom.  Back the tractor into position, disable the 
draft control and lower the linkage.  Connect the 
tractor arms to the digger pins, swing the digger 
frame up and fit the boom on the tractor upper 
hitch clevis, or connect the hitch post on a  
hydraulic digger.  Install the PTO shaft.  Connect 
the hydraulic hoses, if applicable. 

Changing the Auger 

Interchangeable augers of various diameters are 
available for all post hole diggers.  Augers have 
double cutting teeth and range from 4 to 14 
inches in diameter.  Refer to the Specifications 
section for the list of auger diameters available for 
each model.  All augers are of the same length 
and are attached in the same way by two bolts 
through the gearbox output shaft. 

To remove the auger, raise the boom to allow the 
auger to hang vertically then lower until the end of  
the auger is about 100mm above the ground. 
Stop the tractor engine and apply the parking 
brake.  Remove the two attaching bolts from the 
upper end of the auger and pull down so that it 
slides off the gearbox shaft.  If the auger is tight 
on the shaft loosen it by sharply striking the auger 
tube with a hammer where it overlaps the  
gearbox shaft.  If it is necessary to strike the  
auger longitudinally on the flighting to drive it off 
the shaft place a piece of timber on the flighting to 
avoid damage. 

Clean and lightly grease the gearbox output shaft 
and the inner tube of the new auger.  Align the 
bolt holes and slide the auger onto the gearbox 
shaft.  Install and securely tighten the two  
attaching bolts. 

Changing Auger Teeth and Pilot 

When worn the teeth and/or pilot bit on the auger 
head should be replaced to maintain good  
digging performance.  Two types of teeth are  
available and both can be supplied as plain  
forgings or with tungsten carbide tips for longer 
life.  Flat teeth are used for normal ground  
conditions.  Chisel teeth can be fitted for drilling in 
rocky ground.  Tungsten tipped teeth provide long 
life in abrasive conditions but can become 
chipped if used in very rocky conditions.  Plain or 
tungsten carbide tipped pilot bits are also  
available.  The same teeth and pilots fit all  
augers. 

When fitting chisel teeth to double toothed augers 
it is normal to only fit chisels to the inner position 
and retain the flat teeth in the outer position.  
Chisels are rarely required in both positions. 

The teeth are located in the socket of the auger 
head by their U-shaped profile and are held in 
place by a rubber retainer which is wedged  
between the tooth and the socket.  To remove the 
tooth, place a small punch on the rear corner and 
strike sharply with a hammer to drive it out of the 
socket, refer diagram below. 

Содержание FPD 30

Страница 1: ...WA R N I N G R e a d p o w e r d o w n o p e r a t i o n b e f o r e u s e...

Страница 2: ...ic model 6 Connecting hydraulic hoses 7 Attaching Gearbox Auger all models 7 Connecting PTO shaft all models 7 Detaching digger from Tractor 8 Attaching assembled digger to the Tractor 8 Changing the...

Страница 3: ...owned and family operated company We first started manufacturing in 1976 Our company has an excellent production plant in Wodonga set up to specialize in the design and manufacture of post hole digge...

Страница 4: ...as FTM welcomes any warranty repair and apologises for any inconvenience See the last page for the express warranty coverage offered The following information will assist your understanding of warran...

Страница 5: ...start digging until the circum stances have been fully investigated and it is safe to begin x Exercise extreme care when operating in wet or slippery conditions or on sloping or uneven terrain Allow f...

Страница 6: ...of the safety decals fitted to all FTM post hole diggers is shown below It is important that all operators read and follow the information given on the decals They should be kept clean and legible at...

Страница 7: ...ulic cylinder with hoses connected and gearbox with auger attached are supplied as separate items The following instructions apply for the first installation The Hydraulic digger is fitted with bolt o...

Страница 8: ...nput shaft of the gearbox is facing towards the tractor so that the PTO shaft can be fitted Raise the boom to full height to allow the auger to hang vertically then lower it so the end of the auger re...

Страница 9: ...above the ground Stop the tractor engine and apply the parking brake Remove the two attaching bolts from the upper end of the auger and pull down so that it slides off the gearbox shaft If the auger...

Страница 10: ...ecessary to adjust the clutch remove the PTO shaft and turn each of the nuts on the clutch spring bolts by one half turn Turning the nuts clockwise increases spring loading and reduces clutch slip Tur...

Страница 11: ...off the auger flighting then continue drilling When raising or lowering the auger move the tractor forward or backward to keep the auger vertical and compensate for the arc of the boom If the safety...

Страница 12: ...out oil in the gearbox and it is the dealer s responsibility to add it before delivering the machine However before starting the digger for the first time the oil level should be checked and if necess...

Страница 13: ......

Страница 14: ...F G G H H I I J J K K L L 2 1 10 1 14 5 2 9 6 7 8 3 8 7 SPARE PARTS 75 HP POST HOLE DIGGER STANDARD AND POWERDOWN SEE SHEET 2 FOR BILL OF MATERIALS BREAKDOWN OF ITEM 4 4 8 4 12 4 6 4 5 4 3 4 4 4 11 4...

Страница 15: ...HEX NUT 400022 75 HP STD POWERDOWN 4 8 2 M10 FLAT WASHER 400038 75 HP STD POWERDOWN 4 9 2 HEX BOLT M10x70 MM 400040 75 HP STD POWERDOWN 4 10 6 BOLT M12x90 MM UNF 400069 75 HP STD POWERDOWN 4 11 6 FLAT...

Страница 16: ...G G H H I I J J K K L L 2 1 11 1 5 6 2 10 7 8 9 3 9 8 SPARE PARTS 50 HP POST HOLE DIGGER STANDARD AND POWERDOWN SEE SHEET 2 FOR BILL OF MATERIALS BREAKDOWN OF ITEM 4 4 8 4 12 4 6 4 5 4 3 4 4 4 11 4 2...

Страница 17: ...50 HP STD POWERDOWN 4 8 2 M10 FLAT WASHER 400038 50 HP STD POWERDOWN 4 9 2 HEX BOLT M10x70 MM 400040 50 HP STD POWERDOWN 4 10 6 BOLT M12x90 MM UNF 400069 50 HP STD POWERDOWN 4 11 6 FLAT WASHER M12 400...

Страница 18: ...E E F F G G H H I I J J K K L L SPARE PARTS FOR POST HOLE DIGGER 30 HP SEE SHEET 2 FOR BILL OF MATERIALS 6 1 3 8 8 2 10 7 9 COMES IN A PACK OF 4 x BOLT NUT WASHER SEE BREAK DOWN OF ITEM 4 ON RIGHT 4...

Страница 19: ...PRESSURE PLATE B4168 400533 4 5 6 BLUE HD SPRING B3729 400531 4 6 2 M10 HEX NUT 400011 4 7 6 M12 HEX NUT 400022 4 8 2 M10 FLAT WASHER 400038 4 9 2 HEX BOLT M10x70 MM 400040 4 10 6 BOLT M12x90 MM UNF 4...

Страница 20: ...3 1 B8024 24 AUGER 400546 POST HOLE DIGGER ALL 3 1 PAIR OF AUGER TEETH B7512 400525 B8004 B8011 4 2 PAIR OF AUGER TEETH B7512 400525 B8007 B8009 B8014 B8012 4 3 PAIR OF AUGER TEETH B7512 400525 B8015...

Страница 21: ...P O BOX 638 WODONGA VIC 3689...

Отзывы: