FARMTECH FPD 30 Скачать руководство пользователя страница 7

 

 

6

Operation

Attaching to the Tractor - Initial Assembly 

1. Standard Models

Position the linkage frame of the digger behind 
the tractor.  Disable the tractor draft control 
mechanism, fully lower the tractor linkage arms 
and connect the digger linkage pins. Install a 
Lynch pin in each linkage pin to secure the arms. 

Fit the inner end of the boom into the upper  
linkage clevis of the tractor, install the tractor  
linkage pin and secure it with a Lynch pin. 

While supporting the boom, swing the digger 
frame up so that the connecting bolt can be  
installed in the boom bracket.  Tighten the locknut 
on the connecting bolt so the fit is snug but free to 
pivot.  Three holes are provided in the bracket to 
facilitate fitment to different tractors.  Use the hole 
that positions the linkage frame nearest to  
vertical. 

If necessary adjust the sway chains on the tractor 
linkage to centralize the digger and prevent any 
sideways movement. 

Refer to the next page for information on fitting 
the gearbox pivot pin and PTO shaft. 

2. Hydraulic Model 

At the time of delivery the linkage frame with 
boom attached, PTO shaft, hydraulic cylinder with 
hoses connected, and gearbox with auger  
attached are supplied as separate items. The 
following instructions apply for the first  
installation.

The Hydraulic digger is fitted with bolt-on  
Category 2 linkage pins. If it is necessary to fit it 
to a Category 1 tractor, change the pins to 
 Category 1 and use a spacer in the pin hole of 
the upper hitch post to reduce its diameter.   
Category 1 pins and spacers are available from 
FTM dealers.  The upper linkage pin and three 
Lynch pins from the tractor are required to  
complete the installation. 

Place the linkage frame and boom assembly  
behind the tractor.  Disable the tractor draft  
control and lower the linkage arms so they can be 
fitted over the digger linkage pins.  If necessary  
reposition the pins to a more convenient height.  
Fit a Lynch pin in each linkage pin to secure the 
arms. 

Remove the locking bolt from the upper hitch post 
and swing the linkage frame up so the rear  
member is vertical.  Adjust the length of the hitch 
post (to the nearest hole) so it can be fitted into 
the tractor upper linkage clevis.  Refit the locking 
bolt and nut to the hitch post.  Install the upper  
linkage pin and secure with a Lynch pin.  It may 
be necessary to adjust the height of the tractor 
arms so the holes align to enable installation of 
the upper pin. 

Содержание FPD 30

Страница 1: ...WA R N I N G R e a d p o w e r d o w n o p e r a t i o n b e f o r e u s e...

Страница 2: ...ic model 6 Connecting hydraulic hoses 7 Attaching Gearbox Auger all models 7 Connecting PTO shaft all models 7 Detaching digger from Tractor 8 Attaching assembled digger to the Tractor 8 Changing the...

Страница 3: ...owned and family operated company We first started manufacturing in 1976 Our company has an excellent production plant in Wodonga set up to specialize in the design and manufacture of post hole digge...

Страница 4: ...as FTM welcomes any warranty repair and apologises for any inconvenience See the last page for the express warranty coverage offered The following information will assist your understanding of warran...

Страница 5: ...start digging until the circum stances have been fully investigated and it is safe to begin x Exercise extreme care when operating in wet or slippery conditions or on sloping or uneven terrain Allow f...

Страница 6: ...of the safety decals fitted to all FTM post hole diggers is shown below It is important that all operators read and follow the information given on the decals They should be kept clean and legible at...

Страница 7: ...ulic cylinder with hoses connected and gearbox with auger attached are supplied as separate items The following instructions apply for the first installation The Hydraulic digger is fitted with bolt o...

Страница 8: ...nput shaft of the gearbox is facing towards the tractor so that the PTO shaft can be fitted Raise the boom to full height to allow the auger to hang vertically then lower it so the end of the auger re...

Страница 9: ...above the ground Stop the tractor engine and apply the parking brake Remove the two attaching bolts from the upper end of the auger and pull down so that it slides off the gearbox shaft If the auger...

Страница 10: ...ecessary to adjust the clutch remove the PTO shaft and turn each of the nuts on the clutch spring bolts by one half turn Turning the nuts clockwise increases spring loading and reduces clutch slip Tur...

Страница 11: ...off the auger flighting then continue drilling When raising or lowering the auger move the tractor forward or backward to keep the auger vertical and compensate for the arc of the boom If the safety...

Страница 12: ...out oil in the gearbox and it is the dealer s responsibility to add it before delivering the machine However before starting the digger for the first time the oil level should be checked and if necess...

Страница 13: ......

Страница 14: ...F G G H H I I J J K K L L 2 1 10 1 14 5 2 9 6 7 8 3 8 7 SPARE PARTS 75 HP POST HOLE DIGGER STANDARD AND POWERDOWN SEE SHEET 2 FOR BILL OF MATERIALS BREAKDOWN OF ITEM 4 4 8 4 12 4 6 4 5 4 3 4 4 4 11 4...

Страница 15: ...HEX NUT 400022 75 HP STD POWERDOWN 4 8 2 M10 FLAT WASHER 400038 75 HP STD POWERDOWN 4 9 2 HEX BOLT M10x70 MM 400040 75 HP STD POWERDOWN 4 10 6 BOLT M12x90 MM UNF 400069 75 HP STD POWERDOWN 4 11 6 FLAT...

Страница 16: ...G G H H I I J J K K L L 2 1 11 1 5 6 2 10 7 8 9 3 9 8 SPARE PARTS 50 HP POST HOLE DIGGER STANDARD AND POWERDOWN SEE SHEET 2 FOR BILL OF MATERIALS BREAKDOWN OF ITEM 4 4 8 4 12 4 6 4 5 4 3 4 4 4 11 4 2...

Страница 17: ...50 HP STD POWERDOWN 4 8 2 M10 FLAT WASHER 400038 50 HP STD POWERDOWN 4 9 2 HEX BOLT M10x70 MM 400040 50 HP STD POWERDOWN 4 10 6 BOLT M12x90 MM UNF 400069 50 HP STD POWERDOWN 4 11 6 FLAT WASHER M12 400...

Страница 18: ...E E F F G G H H I I J J K K L L SPARE PARTS FOR POST HOLE DIGGER 30 HP SEE SHEET 2 FOR BILL OF MATERIALS 6 1 3 8 8 2 10 7 9 COMES IN A PACK OF 4 x BOLT NUT WASHER SEE BREAK DOWN OF ITEM 4 ON RIGHT 4...

Страница 19: ...PRESSURE PLATE B4168 400533 4 5 6 BLUE HD SPRING B3729 400531 4 6 2 M10 HEX NUT 400011 4 7 6 M12 HEX NUT 400022 4 8 2 M10 FLAT WASHER 400038 4 9 2 HEX BOLT M10x70 MM 400040 4 10 6 BOLT M12x90 MM UNF 4...

Страница 20: ...3 1 B8024 24 AUGER 400546 POST HOLE DIGGER ALL 3 1 PAIR OF AUGER TEETH B7512 400525 B8004 B8011 4 2 PAIR OF AUGER TEETH B7512 400525 B8007 B8009 B8014 B8012 4 3 PAIR OF AUGER TEETH B7512 400525 B8015...

Страница 21: ...P O BOX 638 WODONGA VIC 3689...

Отзывы: