FARMTECH FPD 30 Скачать руководство пользователя страница 11

  

10

Operation

General Operation 

Before operating the digger for the first time carry out the lubrication checks shown in the Lubrication 
and Maintenance section.  Read all the safety information contained in the manual and on the decals 
attached to the machine.  Carefully inspect the area to be dug.

Position the tractor with the auger hanging vertical and touching the ground at the spot where the 
hole is to be dug.  Use the tractor linkage to raise or lower the digger boom on Standard models.  On 
the Hydraulic model use the hydraulic cylinder to raise or lower the boom. 

Disengage the tractor draft control and set the linkage to the FLOAT position, raise tractor engine 
speed to a fast idle so that the auger will revolve in the range of 50 to 100rpm.  The most appropriate 
auger speed will depend upon the available tractor power, the diameter of the auger and the ground 
conditions.  The larger the  
diameter of the auger the slower the speed should be. 

Engage the PTO drive and allow the action of the auger to penetrate the surface. 

On Standard models, slowly lower the tractor linkage to follow the penetration of the auger. 

On the Hydraulic model ensure linkage is in float before applying down-pressure with the hydraulic 
cylinder to increase penetration but limit the pressure to ensure that the tractor wheels are not lifted 
off the ground.

At every 300 to 500mm of depth lift the boom to spin the earth off the auger flighting, then continue 
drilling.  When raising or lowering the auger, move the tractor forward or backward to keep the auger 
vertical and compensate for the arc of the boom. 

If the safety clutch slips reduce the down pressure and if necessary inspect the hole for obstructions. 

Before inspecting the hole or when the required depth has been reached raise the auger from the 
hole and disengage the PTO drive.  Move the tractor away from the hole and lower the auger so that 
the end rests on the ground.  Stop the tractor engine, apply the parking brake and dismount to 
inspect the hole.

Transporting the Post Hole Digger 

Before traveling with the digger attached to the tractor, swing the auger up and forward and secure it 
with the chain provided.  On Standard models fully raise the tractor linkage arms. 

Loop the supplied chain around the lower end of the auger and connect the loose end to the body of 
the chain with the bolt and locknut provided.  Attach the upper end of the chain to the digger boom in 
the same way.  Ensure that the chain is securely attached at both ends. 

Travel slowly at a speed that is safe for the particular ground or road conditions.  If traveling on a 
public road ensure that the tractor is equipped with all the necessary lights and signs to comply with 
local regulations. 

Entrapment in the auger could cause serious injury or death.

Always operate the digger from the tractor seat. 
Under no circumstances stand or allow any person to stand near the auger when it is 
revolving. 
Never clear earth or allow any other person to clear earth from the auger while it is 
revolving. 

Содержание FPD 30

Страница 1: ...WA R N I N G R e a d p o w e r d o w n o p e r a t i o n b e f o r e u s e...

Страница 2: ...ic model 6 Connecting hydraulic hoses 7 Attaching Gearbox Auger all models 7 Connecting PTO shaft all models 7 Detaching digger from Tractor 8 Attaching assembled digger to the Tractor 8 Changing the...

Страница 3: ...owned and family operated company We first started manufacturing in 1976 Our company has an excellent production plant in Wodonga set up to specialize in the design and manufacture of post hole digge...

Страница 4: ...as FTM welcomes any warranty repair and apologises for any inconvenience See the last page for the express warranty coverage offered The following information will assist your understanding of warran...

Страница 5: ...start digging until the circum stances have been fully investigated and it is safe to begin x Exercise extreme care when operating in wet or slippery conditions or on sloping or uneven terrain Allow f...

Страница 6: ...of the safety decals fitted to all FTM post hole diggers is shown below It is important that all operators read and follow the information given on the decals They should be kept clean and legible at...

Страница 7: ...ulic cylinder with hoses connected and gearbox with auger attached are supplied as separate items The following instructions apply for the first installation The Hydraulic digger is fitted with bolt o...

Страница 8: ...nput shaft of the gearbox is facing towards the tractor so that the PTO shaft can be fitted Raise the boom to full height to allow the auger to hang vertically then lower it so the end of the auger re...

Страница 9: ...above the ground Stop the tractor engine and apply the parking brake Remove the two attaching bolts from the upper end of the auger and pull down so that it slides off the gearbox shaft If the auger...

Страница 10: ...ecessary to adjust the clutch remove the PTO shaft and turn each of the nuts on the clutch spring bolts by one half turn Turning the nuts clockwise increases spring loading and reduces clutch slip Tur...

Страница 11: ...off the auger flighting then continue drilling When raising or lowering the auger move the tractor forward or backward to keep the auger vertical and compensate for the arc of the boom If the safety...

Страница 12: ...out oil in the gearbox and it is the dealer s responsibility to add it before delivering the machine However before starting the digger for the first time the oil level should be checked and if necess...

Страница 13: ......

Страница 14: ...F G G H H I I J J K K L L 2 1 10 1 14 5 2 9 6 7 8 3 8 7 SPARE PARTS 75 HP POST HOLE DIGGER STANDARD AND POWERDOWN SEE SHEET 2 FOR BILL OF MATERIALS BREAKDOWN OF ITEM 4 4 8 4 12 4 6 4 5 4 3 4 4 4 11 4...

Страница 15: ...HEX NUT 400022 75 HP STD POWERDOWN 4 8 2 M10 FLAT WASHER 400038 75 HP STD POWERDOWN 4 9 2 HEX BOLT M10x70 MM 400040 75 HP STD POWERDOWN 4 10 6 BOLT M12x90 MM UNF 400069 75 HP STD POWERDOWN 4 11 6 FLAT...

Страница 16: ...G G H H I I J J K K L L 2 1 11 1 5 6 2 10 7 8 9 3 9 8 SPARE PARTS 50 HP POST HOLE DIGGER STANDARD AND POWERDOWN SEE SHEET 2 FOR BILL OF MATERIALS BREAKDOWN OF ITEM 4 4 8 4 12 4 6 4 5 4 3 4 4 4 11 4 2...

Страница 17: ...50 HP STD POWERDOWN 4 8 2 M10 FLAT WASHER 400038 50 HP STD POWERDOWN 4 9 2 HEX BOLT M10x70 MM 400040 50 HP STD POWERDOWN 4 10 6 BOLT M12x90 MM UNF 400069 50 HP STD POWERDOWN 4 11 6 FLAT WASHER M12 400...

Страница 18: ...E E F F G G H H I I J J K K L L SPARE PARTS FOR POST HOLE DIGGER 30 HP SEE SHEET 2 FOR BILL OF MATERIALS 6 1 3 8 8 2 10 7 9 COMES IN A PACK OF 4 x BOLT NUT WASHER SEE BREAK DOWN OF ITEM 4 ON RIGHT 4...

Страница 19: ...PRESSURE PLATE B4168 400533 4 5 6 BLUE HD SPRING B3729 400531 4 6 2 M10 HEX NUT 400011 4 7 6 M12 HEX NUT 400022 4 8 2 M10 FLAT WASHER 400038 4 9 2 HEX BOLT M10x70 MM 400040 4 10 6 BOLT M12x90 MM UNF 4...

Страница 20: ...3 1 B8024 24 AUGER 400546 POST HOLE DIGGER ALL 3 1 PAIR OF AUGER TEETH B7512 400525 B8004 B8011 4 2 PAIR OF AUGER TEETH B7512 400525 B8007 B8009 B8014 B8012 4 3 PAIR OF AUGER TEETH B7512 400525 B8015...

Страница 21: ...P O BOX 638 WODONGA VIC 3689...

Отзывы: