10.1 Adjusting the working depth of the machine
•
Setting the depth of soil processing is executed when the machine is lifted on the rollers by
adding or removing distance washers on the piston rods of the rollers.
•
When changing the depth of soil processing, the pins of the tracing wheels also have to be
adjusted in the relevant positions.
• The same number of washers must be set on all piston
rods!!!
•
The change ratio between the thickness of the crossbars
and the working depth is 1:3.
•
Example: Adding or removing a washer with the
thickness of 3mm (0.12in) changes the working depth of
the machine by 8-9mm (0.32-0.35in).
•
Tab.1 includes the individual working positions and the
number of washers needed to achieve the required
depth of the machine.
•
The position of the tracing wheel for the individual
depths is provided in Tab. 1in the first column. The
number of the position in the table corresponds with
the number of the opening for the pin on the tracing
wheel arm.
•
Specified working depths at individual positions are only
for information. They may vary according to particular
soil conditions. Required number of distance washers
may be added/removed as needed.
1 – The position of the tracing wheel
2 – Number of washers
3 – Working depth
Tab.1 – Setting of working depth in mm/in
37
|
52
Содержание SOFTER 8 8 PS
Страница 2: ...2 52 Prepared by Technical Department Farmet a s on 16 01 2023 changes reserved...
Страница 4: ...PREFACE 4 52 IMPORTANT READ CAREFULLY BEFORE USE KEEP FOR FUTURE REFERENCE...
Страница 6: ...PREFACE 6 52...
Страница 15: ...WORK SAFETY LABELS Fig 1 Location of safety labels on the machine SOFTER 8 PS 15 52...
Страница 16: ...WORK SAFETY LABELS SOFTER 11 PS 16 52...
Страница 32: ...COMMISSIONING Warning The machine must only be transported by the axle not rollers 32 52...
Страница 52: ...SERVICING AND WARRANTY CONDITIONS 52 52...