PROCEDURE FOR FOLDING THE MACHINE
Description of the
task
Position
of ball
valves
Pressure
in the
hose
Schema
1a. Lift the unfolded
machine on all
rollers, or on rollers
and the drawbar.
1b. When the
machine is equipped
with a separate axle,
lift the machine also
on the axle.
2. Close the ball
valve of the axle –
the central roller
(bottom valve) and
use the yellow
circuit to lift the side
rollers so that the
machine is standing.
3. Fold the machine
4. Check that the
side rollers are
correctly folded.
5. Secure the side
frames by the
securing rod in the
front, close ball
valves.
28
|
46
Содержание DISKOMAT 5 PS
Страница 2: ...2 46 Prepared by Technical Department Farmet a s on 24 01 2022 changes reserved ...
Страница 4: ...PREFACE 4 46 IMPORTANT READ CAREFULLY BEFORE USE KEEP FOR FUTURE REFERENCE ...
Страница 6: ...PREFACE 6 46 ...
Страница 15: ...WORK SAFETY LABELS Fig 1 Location of safety labels on the machine 15 46 ...
Страница 46: ...SERVICING AND WARRANTY CONDITIONS 46 46 ...