FarmChem | www.FarmChem.com
4
New installation
1.
Relieve the pressure
2.
Close the fluid shut-off valve at each dispense position
3.
Make sure the main fluid outlet valve at the pump is closed, the air pressure to
the pump motor is adjusted, and the air valve is open. Slowly open main fluid
valve
4.
Place the hose end (with no dispense valve connected) into a container
for waste oil. Secure the hose in the container so it will not come out during
flushing. If you have multiple dispense positions, first flush the dispense position
farthest from the pump, and work your way toward the pump
5.
Slowly open the shut-off valve at the dispense position. Flush out a sufficient
amount of oil to ensure that the entire system is clean, and close the valve
6. Repeat step 5 at all other dispense positions
WARNING
To reduce the risk of serious injury whenever you are instructed to relieve
pressure, always follow the pressure relief procedure on page 3
Fig. 2
1. Trigger 2. Nozzle 3. Auto No-Drip Tip 4. Swivel Nut
Remark:
Adjust the angle of the nozzle by loosening the #4 swivel nut, then by turn
-
ing the nozzle to your desired position and tightening the nut.
Existing Installation
1.
Relieve the pressure
2.
Loosen and disconnect the hose from the old dispense valve (the one that
you are replacing)
3.
Thread the extension into the outlet of the dispense valve, and tighten firmly
4.
Apply thread sealant to the male threads of the hose fitting, thread the hose
fitting into the swivel, and tighten firmly
5.
Thread the new nozzle or nozzle adapter onto the extension, and tighten firmly
6.
Open all dispense position shut-off valves, and start the pump to pressurize the
system. See the operation section for more
7.
For metered dispense valves, to ensure dispensing accuracy, purge all air from
the fluid lines and dispense valves before you use them
NOTE: Do not overtighten the extension tube assembly by using the nozzle adapter
to hand turn the nozzle. For rigid extensions, thread the extension in at least three
full turns, position the extension for proper alignment, and tighten the sealing nut.
The PTFE seal on the sealing nut must face the valve housing.
WARNING
To reduce the risk of serious injury whenever you are instructed to relieve
pressure, always follow the pressure relief procedure on page 3
Содержание APX Industrial DCM-01
Страница 1: ...Manual 800 247 1854 www FarmChem com DCM 01 Digital Manual Meter...
Страница 8: ...FarmChem www FarmChem com 8 EXPLODED AND PARTS LIST...
Страница 11: ...800 247 1854 FarmChem 11...
Страница 12: ......