INSTALLATION
Check the appliance is electrically safe and gas sound when you have finished.
23
Checking the Parts:
3 pan supports
Griddle
ArtNo.000-0001 90 Pan supports
Wok cradle
Deluxe oven tray and trivet
ArtNo.000-0009 Wok ring, cast
2 standard shelves
2 flat shelves
ArtNo.324-0009 Tall oven shelf
Grill pan
Plinth
ArtNo.331-0008 - 90SC
grill pan & trivet
Stability bracket
Restraining chain & hook
ArtNo.020-0021 - Restraining
chain & hook
You will need the following equipment to complete the
cooker installation satisfactorily:
•
Flexible gas hose.
•
Gas pressure tester/manometer.
•
Multimeter: For electrical checks.
You will also need the following tools:
1.
Electric drill
2.
Masonry drill bit (only required if fitting the cooker on a
stone or concrete floor)
3.
Wall plugs (only required if fitting the cooker on a stone
or concrete floor)
4.
Steel tape measure
5.
Cross head screwdriver
6.
Flat head screwdriver
7.
4 mm & 3 mm Allen keys
8.
Spirit level
9.
Pencil
10.
Adjustable spanner
11.
13 mm spanner or socket wrench
12.
Screws for fitting the restraining chain and bracket
Содержание Professional+100 FX Dual Fuel
Страница 1: ...USER GUIDE INSTALLATION INSTRUCTIONS Professional 100 FX Dual Fuel Australia U110400 01 ...
Страница 2: ......
Страница 4: ...ii ...
Страница 43: ...39 Notes ...