F-40 Laminator Operator Manual
Installation
© GBC Pro-Tech 1998 February
2-1
6HFWLRQ ,QVWDOODWLRQ
Before a Falcon 40 Laminator can be installed there are
a few requirements that must be met. Make certain that
each of the requirements listed in the following prein-
stallation checklist are met before beginning installa-
tion.
CAUTION
3UHLQVWDOODWLRQ &KHFNOLVW
❏
Are doorways and hallways wide enough for the
laminator to be moved to the installation site?
❏
Is there ample room for the laminator?
A work area must be established that allows for
operation in both the front and the rear of the
machine and provides space for efficient material
flow. Figure 2-1 shows a typical machine area lay-
out.
❏
Is the environment appropriate for the laminator?
The laminator requires a clean, dust and vapor free
environment to operate properly. It must not be
located where there is air blowing directly on the
machine.
WARNING
CAUTION
❏
Is there an appropriate power outlet available or
has a certified electrician been contacted to wire
the laminator directly?
The laminator requires 30A single phase service
and a power receptacle that accepts a 30A 250V
NEMA L6-30P plug or, in Europe, 3 phase, 240/
400 VAC with 20A per phase. See Figure 2-6 for
power cord connection options.
CAUTION
Failure to follow the preinstallation checklist can
result in damage to the laminator.
The operating environment must be free of dust,
flammable liquids and vapors. You can be
injured by inhaling chemical vapors. Vapor build
up or stored flammable liquids can cause a fire.
Excessive dust can damage the laminator.
Do not locate the laminator where air is blowing
directly on the machine. The air flow can cool
the rolls unevenly and result in poor quality
output.
Position the jumpers as shown in Figure 2-6 for
service choice.
Содержание F-40
Страница 10: ...Safety F 40 Laminator Operator Manual 1 6 GBC Pro Tech 1998 February Blank page...
Страница 44: ...Warranty F 40 Laminator Operator Manual 5 2 GBC Pro Tech 1998 February Blank page...
Страница 46: ...Specifications F 40 Laminator Operator Manual 6 2 GBC Pro Tech 1998 February Blank page...