Pre-Installation Site & Product Check
1a Check that the product model is correct for the required application.
1b Check that all parts listed on the Bill of Material are in the shipping container.
1c
Check the architectural drawings and final approved shop drawings for the position of frame and structural openings.
1d Check header and frame dimensions and required clearances.
26”
26”
1/8” max reveal
1e Check door width:
26” minimum for 26” Push Operator
30” minimum for 26” Pull Operator
1f Check that door weight is 200 lbs. or less. For heavier door, consult factory.
1g Check that a 115 volt, single phase, 60 Hz, fused 15 amp, 3-wire power supply is available at the side jamb with
approximately 12” of wire available to connect to the Operator. UL approved flexible conduit is recommended for the
115 volt power line.
The 115 volt power supply must be a dedicated circuit from the main circuit breaker panel and must NOT be
connected into any building lighting system that operates florescent lights.