background image

18.   Defects - Malfunctions

,QWHUYHQWLRQVE\DVSHFLDOL]HVWHFKQLFLDQ

PROBLEM

Dispensing slow.
Coffee burnt and cold.
Cream very dark, with tendency of 
formation of an “eye”.

Dispensing slow, coffee burnt.
Pressure gauge pump lower than 9 bar.

Drainage tube leaks when group is at rest 
(defect only on one group).
Coffee dispensed normally.

Group at rest
Dispensing valve gasket fails rapidly.
Water leak from the drainage tube.
Coffee dispensed normally.
Defect on all groups.

Group at rest.
Continuous loss of cold water in the 
drainage tray. Groups do not dispense 
any more coffee and the pressure gauge 
pump shows low values.

Group in operation.
Drainage tube leaks.
No coffee.

Group in operation.
Loss of cold water in drainage tray.
Coffee bland.
Dispensing slow.

Group leaks at cam shaft.

'LI¿FXOWWRPRYHWKHJURXSV

Machine does not go into pressure or 
reaches pressure level slowly.

Groups function normally.
Pressure gauge pump does not give 
correct pressure reading (8 ÷ 9 bar).

Pump does not reach pressure level.
No dispensing.

Pump noisy.

SOLUTION

If this defect is not corrected immediately, the 
water softener runs out long before the expiry 
time, with consequent scale deposit.

If this defect is not corrected immediately, 
the water softener runs out long before 
the expiry time, with consequent scale 
deposit.

If this defect is not corrected immediately, 
the water softener runs out long before 
the expiry time, with consequent scale 
deposit.

Remove the glands taking care not to mark 
the housings. Do not use tools made of 
steel or other hard materials.
Before remounting, clean the shaft 
thoroughly, especially the grooves

Steam taps leak:

CAUSE

&RIIHHJURXQGVWRR¿QH

Low pressure in pump.

0HVK¿OWHUDERYHVSRXWGLUW\

Spout partially blocked.

Pump out of calibration.
Pump with reduced capacity.

Dispensing valve does not hold.

Expansion valve with calibration too high 
(above 12 bar).

Expansion valve remained open.

Drainage valve does not hold.

Expansion valve out of calibration (opens 
at less than 9 bar).

Leak on the two glands.

&DPSUR¿OHZRUQ

No electricity.
Automatic switch gone off.
Resistances burned.
Electric circuit to resistance interrupted.
No water in boiler.

Pressure gauge defective.

Motor does not work:
- No electricity.
- Capacitor burnt.
- Microswitch burnt.
- Motor burnt.
Check valve pump open.
By pass valve completely opened.

Pump defective.
No water in system.

34

English

Содержание E61 3 GR

Страница 1: ...RGL FDFLRQHV H LQWHJUDFLRQHV H DOWHUDo HV H LQWHJUDo HV VXEVHTXHQWHV 6HGH OHJDOH 5HJLVWHUHG RI FH 6LqJH VRFLDO Rechtssitz Sede legal Sede legal Via A Manzoni 17 Binasco Mi ITALY Data Date Date Datum F...

Страница 2: ...0 14 0 65 x 2 0 65 x 3 0 65 x 4 133 C 12 bar L Capacit Capacity Capacit Kapazit t Capacidad Capacidade Caldaia Service boiler Chaudi re Heizkessel Caldera Caldeira Scambiatore Heat exchanger changeur...

Страница 3: ...3 1 2 5 6 7 14 9 8 16 2 2 7 6 10 10 13 15 17 18 1 5 10 18 2 17 6 7 14 16 9 8 13 15 1 10 18 2 17 6 7 14 16 9 8 13 15 E61 3 GR E61 1 GR E61 2 GR...

Страница 4: ...re gauge 15 Pan 16 Pressure gauge pump 17 Cup warmer tray 18 Backlit glass switch 19 Backlit glass LEGENDA 1 Interruptor geral 2 RWmR GH GLVWULEXLomR GR FDIp 5 RWmR GH FDUUHJDPHQWR GD iJXD QD caldeira...

Страница 5: ...mbly 92 Setting 94 Wiring diagram 96 Hydraulic circuit 98 Service Line 102 Dear Madam Dear Sir Congratulations on your new Faema With this purchase you have chosen an advanced espresso coffee machine...

Страница 6: ...e The machine is for professional use only The machine must not be used by children or by people with physical sensorial or mental impairments if such people use the machine they must be supervised du...

Страница 7: ...ter Do not obstruct openings or ventilation and heat vents Do not install the machine outdoors Prior to installation make sure there is a circuit breaker installed with a distance between the contacts...

Страница 8: ...ee laws and regulations in force Check on the machine s water inlet that the pH level complies with the laws in force the chloride value is less than 100 mg l If the values do not fall within the limi...

Страница 9: ...oup dispense water for about a minute HOT WATER Continuously dispense hot water pressing the appropriate button until at least 4 liters of water have been used for a machine with 1 group 6 liters of w...

Страница 10: ...y of the coffee 8QKRRN WKH OWHU KROGHU 10 from the group 2 Place the grounds in the grounds drawer LOO WKH OWHU ZLWK D GRVH RI JURXQG FRIIHH 4 Level out with the coffee press QVHUW WKH OWHU KROGHU 10...

Страница 11: ...and the WHPSHUDWXUH LV VXI FLHQWO KLJK VWRS WKH RZ RI VWHDP E turning knob 7 the other way towards 0 When the steam jet pipe 6 is no longer required clean it thoroughly with a sponge and a clean cloth...

Страница 12: ...le follow these steps Turn the nozzle towards the cup tray and carefully activate steam dispensing at least once Drip pan Remove the drip plan and complete the cleaning with running water Discharge ta...

Страница 13: ...the steam nozzle for at least 3 seconds and let the steam escape so that the condensation is eliminated Coffee dispensing If the machine has not been used for more than an hour before making coffee d...

Страница 14: ...RI WLPH DW QLJKW GXULQJ WKH weekly closing day or during holidays the following operations shall be performed Remove the plug or switch off the main switch Close the water tap Non compliance with the...

Страница 15: ...ead 1R OH SHUPLWV WKH SDVVDJH RI D VPDOO FDOLEUDWHG TXDQWLW RI ZDWHU LQWR WKH JURXS FDP FKDPEHU GLVSHQVLQJ FKDPEHU GXFWV DQG VSDFH RQ WKH JURXQG FRIIHH ZKLFK JUDGXDOO OOV XS XQWLO WKH OHYHO RI SUHVVXU...

Страница 16: ...ALI electrical equipment is marked with a pictogram of a garbage can inside a barred circle This symbol means that the equipment was sold on the market afterAugust 13 2005 and must be disposed of acco...

Страница 17: ...than 9 bar Low coffee yield Fast dispensing Coffee hot and bland Coffee cold bland and without cream Normal infusion and dispensing times Coffee cold in the morning at start of work SOLUTION This def...

Страница 18: ...the water softener runs out long before the expiry time with consequent scale deposit If this defect is not corrected immediately the water softener runs out long before the expiry time with conseque...

Страница 19: ...Conexi n monof sica Liga o mono f sica N Bianco White Blanc N Azzurro Blue Bleu Wei Blanco Branco Blau Az l Azul T Nero Black Noir T Marrone Brown Marron Schwarz Negro Preto Braun Mar n Marron 1 2 In...

Страница 20: ...tage du plan de chauffe tasses et de petite vitrine HVVHUUHU OHV DJHV B et retirer le plan HPRQWDJH GHU EVWHOO lFKH XU 7DVVHQYRUZlUPXQJ L sen Sie die Feststellklemmen B und nehmen Sie Abstel O lFKH XU...

Страница 21: ...MR O QDO GH OD UHSDUDFLyQ YROYHU D UHDOL DU ODV PLVPDV instrucciones pero desde el punto 6 al 1 Desmontagem da estrutura 1 Desmontagem do tabuleiro para aquecer as ch venas da montra e do pain l super...

Страница 22: ...ntervention switch on again MAQUINE EQUIP E DE THERMOSTAT DE SURET En cas d intervention du thermostat brancher de nouveau MIT SICHERHEITSTHERMOSTAT AUSGESTATTETE MA SCHINE Falls der Thermostat ausgel...

Страница 23: ...le groupe le plus froid A LQGH GH UpIpUHQFH WDUDJH VWDQGDUG EINSTELLUNG DES W RMEUMLAUFKREISES Gehen Sie zur Einstellung der Betriebstemperatur der Einheit wird folgt vor Drehen Sie den Regler zur Er...

Страница 24: ...96 Schema elettrico Wiring diagram Sch ma l ctrique Elektrischer Shaltplan Esquema electrico Esquema el ctrico...

Страница 25: ...Interrupteur led 59 Fusibles pompe Les d tails ne sont appliqu s TX j FHUWDLQHV FRQ JXUDWLRQV de produit I GB F LEYENDA 1 Interruptor general 2 Switch motor bomba 20 Sonda nivel 21 Motor bomba 22 Con...

Страница 26: ...98 Circuito idraulico Hydraulic circuit Circuit hydraulique Hydraulikplan Circuito hidraulico Circuito hidr ulico...

Страница 27: ...ira gua quente 13 Indicador de n vel da gua em caldeira 0DQyPHWUR GD FDOGHLUD 0DQyPHWUR GD UHGH bomba 20 Sonda de n vel 21 Motor bomba 3UHVVyVWDWR 34 Electrov lvula n vel 35 Filtro para bomba 5HJXODom...

Страница 28: ...100...

Страница 29: ...LJW NRSLHUW RGHU YHU IIHQWOLFKW werden Copyright by GRUPPO CIMBALI S p A Milano Alle Rechte vorbehalten GRUPPO CIMBALI S p A Via A Manzoni 17 20082 Binasco MI Italy Tel 39 2 90 04 91 90 04 81 D www fa...

Страница 30: ...HP 9HUWUHWHU GLH DWDORJ 1U DQJHEHQ FAEMA e il SERVICE LINE O VHUYL LR DVVLVWHQ D GHOOD VRFLHWj 0 QHOO LQWHQWR GL HVVHUH YLFLQR DL 6 OLHQWL QHOOD VFHOWD GHL SURGRWWL SHU LO PLJOLRU XWLOL R GHOOD PDFFKL...

Отзывы: