FIRST RUNNING TEST

ATTENTION:  supply the system with power only 
when wiring is completed.

Pic. 15

All NC contacts to  

the Elpro S40 

controller must be 

closed

Once the bollard and all of the the safety (make sure that all the NC contacts 
in the Elpro S40 controller are actally closed) and command accessories are 
finally installed, the respective connections to Elpro S40 done and the risk 
analysis completed, the first running test can be carried out.

If a remote control is available, once satisfied it has been properly match 
encoded with the radio receiver following the instructions provided with it, 
pulse once for the post to rise.

[C]

 Check the electrical connections to the limit switches; then, once the electric power is supplied, check the status of 

the LEDs first of all as follows: with the post in down posistion the L8 LED must be OFF, while L9 must be ON; if not, swap 
the connections to terminals 11 and 12 in Elpro S40.

ATTENTION: the post must be fully down. If the post goes up, even partially, 
during the installation phase,  override the system by the manual release and 
allow for the post to go down completely to the end of the permitted stroke, 
then tighten by the release spanner (Pic. 23).

SOLENOID VALVE

Voltage stabilizer

Connect a voltage stabilizer 
if the bollard is fitted with a 
solenoid valve

Pic. 16

If the application requires more than one bollard, go through all of the steps with each of them.

L8 

= Limit switch Opening M1, normally 

ON, off with the post in down position

L9

 = Limit switch Closing M1, normally 

ON, off with the post in up position

Retractable Oil-hydraulic Bollard

English

55 56

55 56

12

Содержание TALOS Series

Страница 1: ...BOLLARD WITH RETRACTABLE CYLINDRICAL POST OIL HYDRAULICALLY OPERATED GB Instructions manual pages the gate opener 1 20 EN 13241 EN 12453 EN 12445...

Страница 2: ...e safety accessories such as photocells sensitive edges etc Carry out a risk analysis by means of appropriate instruments measuring the crushing and impact force of the main opening and closing edge i...

Страница 3: ...an area The TALOS series includes a vast selection of options as indicated below varying in height thickness and depth of embedding constraint for impact resistance the abbreviation HRC identifies th...

Страница 4: ...triangular socket end Post cover with rubber edge n 9 Led lights flashing amber in colour Back reflecting sticker with logo Box to house the electric cable from the electronic controller Cover plate C...

Страница 5: ...supply cable 9 Post for Fit 55 photocell projector 10 Oil hydraulic bollard Talos series 11 Vix 53 remote control transmitter 12 Post for Fit 55 photocell receiver 13 Visual 344 post to take command a...

Страница 6: ...own into the pre holed seats NOTE WELL make sure the ground cable is disconnected from the casing before lifting Carefully hoist and remove the inner assembly of the bollard by a winch Make sure the c...

Страница 7: ...ead the electric cables through it from a junction box or directly from the electronic controller Elpro S40 Pic 6 NOTE WELL the foundation casing is to be set perfectly levelled and the upper edge mus...

Страница 8: ...r than the surrounding walking surface in order to limit the amount of water that may get inside it Cast concrete all around the casing up to 5 10 cm from walking level Wait all the time required for...

Страница 9: ...al see catalogue Pre assembled loop 12 metres circumference optional see catalogue Power supply cable max 10 metres pre fitted to the loops Detector for metallic masses See the instructions supplied w...

Страница 10: ...allation as required either for public or private users and in compliance with the existing safety norms A screw is provided for proper connection For applications in public areas use a cable having a...

Страница 11: ...B of the Elpro S40 controller unless required to achieve a good performance of the bollard For the Talos option 12 mm thickness a 20 F capacitor is required to be added to the terminals A and B of El...

Страница 12: ...he electric power is supplied check the status of the LEDs first of all as follows with the post in down posistion the L8 LED must be OFF while L9 must be ON if not swap the connections to terminals 1...

Страница 13: ...nce of the bollard For the Talos option 12 mm thickness a 20 F capacitor is required to be added to the terminals A and B of Elpro S40 common common connections to the electric motor of the hydraulic...

Страница 14: ...HE POST BE ASSISTED TO REACH THE FULLY FLAT DOWN POSITION Retractable Oil hydraulic Bollard English Pic 21 Pressure switch adjustment 1 Unscrew the M5 pin 2 Adjust the sensitivity using an allen key s...

Страница 15: ...pment to release the unit and allow manual lowering ATTENTION once the post has been manually lowered rising can be made possible only by powering the system and pulsing it to rise Pic 23 Help the pos...

Страница 16: ...tion date Quantity of models installed Maintainer Date NOTE WELL this document must record any ordinary and extraordinary services including installation maintenance repairs and replacements to be mad...

Страница 17: ...ic board controlling the bollard s e g flooded relay contacts oxidized terminal clamps etc Check the correct functioning and positioning of the limit switches Check the release system for bollard manu...

Страница 18: ...interfere with it 6 Make sure that electromagnetic sources are at a suitable distance from the accessories especially from the loop detectors The magnetic fields of other sources might affect the dete...

Страница 19: ...ion impact resistance 90 000 J breakout resistance 550 000 J Static load max 1 500 kg in standing position max 20 000 kg in lowered position Working temperature 40 C 80 C Supply voltage 230 Vac 10 50...

Страница 20: ...out 12 Vdc 600mA LED lights 12 Vdc Post material S235JRH 4 mm steel S355J2H 12 mm steel AISI 304 inox AISI 316 inox brushed SS steel standard HRC Impact resistance thick 4 52 000 J 70 000 J Crash resi...

Отзывы: