background image

2

FIBO

  

300 

INSTRUCTIONS FOR THE INSTALLATION OF THE SLIDING

GATE OPERATOR

PIC. 1

FOR CORRECT FIBO 300 INSTALLATION AND GOOD PERFORMANCE, PLEASE READ THE INSTRUCTIONS OUTLINED IN THIS MANUAL
CAREFULLY AND KEEP TO THE DIAGRAMS.

IMPORTANT

: THE ENTIRE INSTALLATION MUST BE CARRIED OUT BY QUALIFIED TECHNICAL PERSONNEL IN COMPLIANCE WITH

EN 12453 – EN 12445 SAFETY STANDARDS AND IN ACCORDANCE WITH MACHINERY DIRECTIVE 98/37/EC.

GENERAL INFORMATION

The three-phase 1.1KW (1.5 HP) FIBO 300 is an automation for heavy sliding gates and industrial doors (the field of use varies from a
gate weight of 1˙000 to approx. 2˙500 Kg); the gear motor unit is installed inside a sheet steel protection cover, which is fixed to a thick
metal base plate. The protection cover houses the power panel and the electronic command programmer, while the limit switches are
already attached to the body of the gear motor. The protection cover can only be accessed by using the customized key. This is a strong
and reliable automation for intense opening/closing cycles. The drive shaft is in direct contact with a mechanical torque control device;
worm and gear are made of bronze and steel and are supported by bearings, in an oil bath. The irreversible worm-gear coupling makes
it possible to block the gate in any stop position. A manual overriding system allows manual gate operation in emergency events such
as power failure.

POINTS TO CHECK WITH THE GATE

IMPORTANT

: Make sure that the gate 

track

 is well fixed to a solid foundation in order to prevent deformation which would result in

unbalanced gate motion (Pic. 1).

IMPORTANT

: Make sure that 

gate stops

 are fixed in the 

open

 and 

closed

 gate positions so that the gate does not over travel the

permitted limit and exit the upper guide (Pic. 1).

IMPORTANT

: Make sure that, once the gate has reached the end of the permitted travel area, it does not hit the 

gate posts

 or special

gate stops so as to avoid damaging the gate structure (Pic. 1).

PIC. 2

GATE POST

UPPER
GUIDE ON
GATE POST

GATE POST

OPENING
GATE
STOP

HEAVY
GATE TO BE
OPENED

SLIDING
TRACK

CLOSING
GATE
STOP

“H”

PROTECTION
COVER

“A”

SCREWS TO FIX
THE PROTECTION
COVER

DOOR

“C”

INTERNAL ACCESS
THROUGH
CUSTOMIZED KEY

“G”

BASE PLATE

Содержание FIBO 300

Страница 1: ...G B INSTALLATION MANUAL...

Страница 2: ...ion for intense opening closing cycles The drive shaft is in direct contact with a mechanical torque control device worm and gear are made of bronze and steel and are supported by bearings in an oil b...

Страница 3: ...THE PLUGS ONCE THE PLUG PROTRUSION HAS BEEN ESTABLISHED TIGHTEN THE NUT TO THE FLOOR IN ORDER TO FIRMLY FIX THE PLUG IN THE HOLE THEN UNSCREW AND REMOVE THE NUT INSERT THE PLUGS IN THE HOLES LEAVING A...

Страница 4: ...te Pic 6 Temporarily clamp the rack to the gate levelling it using a spirit level for the entire length of the gate the rack must mesh the idle Fibo 300 driving gear I smoothly and without friction Th...

Страница 5: ...located on the front beneath the electric power panel E P P tighten in order to increase the torque and loosen in order to reduce the torque Pic 10 PIC 8 PIC 9 RACK SPARE RACK AS A PITCH GAGE IMPORTA...

Страница 6: ...ING ON AUTOMATIC CLOSING ON PREFLASHING ACTIVATED ON RADIO STEP BY STEP STOP IN BETWEEN ON DEAD MAN CONTROL Dip 4 OFF and Dip 3 OFF ON NO LAMP ON DURING DWELL TIME OFF NO FUNCTION EXT TIME PEDESTRIAN...

Страница 7: ...21 A 1 2 4 6 22 A 2 1 2 3 4 5 M 16 17 18 19 20 21 22 23 R S T THREE PHASE ELECTRIC MOTOR 230 V 25 W max FLASHING LAMP SUPPLY VOLTAGE 230 400 V 10 THREE PHASE HIGH VOLTAGE 10 A 380 V FUSES POWER CONTAC...

Страница 8: ...d Bridge terminals 3 and 6 if no key or push button switches are required N W To fit extra accessories such as lights CCTV etc use only solid state relays to prevent damages to the microprocessor DIP...

Страница 9: ...13 13 17 10 15 16 14 PIC 12 Holdonswitched Deadman control Pedestrian Opening Trimmer T3 OPERATING MODES from 3 to 30s It can be activated by any pulse eg by remote control superior to 2s 3 DIP SWITCH...

Страница 10: ...provided Pic 11 and Pic 15 following the Elpro 10 PLUS function logic description Drwg 3499 p 6 E P P ELECTRIC POWER PANEL WITH THE ELPRO 10 PLUS PROGRAMMER INCORPORATED SUPPORT PREPARED FOR ATTACHING...

Страница 11: ...cles a year 8 hours a day 131 000 FIBO 300 GEAR MOTOR Output revolutions 40 7 rpm Drive gear Z 24 Module 4 0 Ratio 1 32 Maximum nominal torque 128 Nm Transfer speed 12 m min Hydraulic oil type AGIP RO...

Страница 12: ...isconnect the mains switch before opening the electrical wire junction box cover The whole automation should be earthed with the yellow green wire We recommend reading the Safety Norms suggestions and...

Отзывы: