background image

2

oil-hydraulic barrier

BAYT 980

GENERAL WARNINGS FOR PEOPLE SAFETY

INTRODUCTION 

This operator is designed for the specific scope of applications 
as indicated in this manual, it includes safety, control and 
signaling accessories as minimum required and 

FADINI

 

equipment. 

 Any applications not explicitly included in this 

manual may cause operation problems or damages to 
properties and people. 

 Meccanica Fadini snc is not liable for 

damages caused by the incorrect use of the equipment, or for 
applications not included in this manual or for malfunctioning 
resulting from the use of materials or accessories not 
recommended by the manufacturer. 

 The  manufacturer 

reserves the right to make changes to its products without 
prior notice. 

 All that is not explicitly indicated in this manual

is to be considered not allowed.

BEFORE INSTALLATION

Before commencing operator installation assess the suitability 
of the access, its general condition and the structure. 

 Make 

sure that there is no risk of impact, crushing, shearing, 
conveying, cutting, entangling and lifting situations, which 
may prejudice people safety. 

 Do not install near any source of 

heat and avoid contacts with flammable substances. 

 Keep all 

the accessories able to turn on the operator (transmitters, 
proximity readers, key-switches, etc) out of the reach of the 
children. 

 Transit through the access only with stationary 

operator. 

 Do not allow children and/or people to stand in the 

proximity of a working operator. 

 To ensure safety in the 

whole movement area of a gate it is advisable to install 
photocells, sensitive edges, magnetic loops and detectors. 

 

Use yellow-black strips or proper signals to identify dangerous 
spots. 

 Before cleaning and maintenance operations, 

disconnect the appliance from the mains by switching off the 
master switch. 

 If removing the actuator, do not cut the 

electric wires, but disconnect them from the terminal box by
loosening the screws inside the junction box.

 

 Make sure that 

in the near proximity or inside the installation accessories there 
aren’t any electromagnetic sources of disturbance, such that 
they can cover or affect the magnetic/electromagnetic 
detections of possible loop detectors as well as of all of the 
electronic units that command and control the system.

INSTALLATION

All installation operations must be performed by a qualified 
technician, in observance of the Machinery Directive 
2006/42/CE and safety regulations EN 12453 - EN 12445. 

Verify the presence of a thermal-magnetic 0,03 A - 230 V - 50 Hz 
circuit breaker where the main electric source of power of the 
installation is located. 

 Use appropriate objects to test the 

correct functionality of the safety accessories, such as 
photocells, sensitive edges, etc. 

 

Carry out a risk analysis by 

means of appropriate instruments measuring the crushing and 
impact force of the main opening and closing edge in 
compliance with EN 12445. 

 Identify the appropriate solution

necessary to eliminate and reduce such risks.

 During the rotation of the beam there must not be obstacles 

or points of contact that interfere with the movement.

 

In case where the gate to automate is equipped with a 

pedestrian entrance, it is appropriate to prepare the system in 
such a way to prohibit the operation of the engine when the 
pedestrian entrance is used. 

 Apply safety nameplates with 

CE marking on the gate warning about the presence of an 
automated installation. 

 The installer must inform and 

instruct the end user about the proper use of the system by 
releasing him a technical dossier, including: layout and 
components of the installation, risk analysis, test of safety
accessories, test of impact forces and report of residual risks.

INFORMATION FOR END-USERS

The end-user is required to read carefully and to receive 
information concerning only the operation of the installation 
so that he becomes himself responsible for the correct use of it. 

 The end-user shall establish a written maintenance contract 

with the installer/maintenance technician (on -call). 

 Any 

maintenance operation must be done by qualified technicians. 

 Keep these instructions carefully.

WARNINGS FOR THE CORRECT OPERATION OF THE 
INSTALLATION

 

To achieve a long lasting performance of system in compliance 
with the safety regulations, it is necessary that proper 
maintenance and monitoring of the entire installation be 
performed: including the automation, the electronic 
equipment and the cables connected to these. 

 The entire 

installation must be carried out by qualified technical 
personnel, filling in the Maintenance Manual indicated in the 
Safety Regulation Book (to be requested or downloaded from 
the site www.fadini.net/supporto/downloads). 

 Operator: maintenance inspection at least every 6 months, 

while for the electronic equipment and safety systems an 
inspection at least once every month is required. 

 The 

manufacturer, Meccanica Fadini snc, is not responsible for 
non-observance of good installation practice and incorrect 
maintenance of the installation.

DISPOSAL OF MATERIALS

Dispose properly of the packaging materials such as 
cardboard, nylon, polystyrene etc. through specializing 
companies (after verification of the regulations in force at the 
place of installation in the field of waste disposal). Disposal of 
electrical and electronic materials: remove and dispose 
through specializing companies, as per Directive 2012/19/UE. 
Disposal of substances hazardous for the environment is
prohibited

.

CE DECLARATION OF CONFORMITY of the manufacturer:

Meccanica Fadini snc (Via Mantova, 177/A - 37053 Cerea - VR - Italy) declares under own responsibility that: 

Bayt 980

 complies 

with the 2006/42/CE Machinery Directive, and also that it is sold to be installed in an “automatic system”, along with original 
accessories and components as indicated by the manufacturing company. An automatic gate operator is, by law, a “machinery” 
and therefore the installer must fit the equipment with all of the applicable safety norms. The installer is also required to issue 
the installer’s Declaration of Conformity. The manufacturer is not liable for possible incorrect use of the product. The product 
complies with the following specific norms: analysis of the risks and subsequent action to cure them as per EN 12445 and EN 
12453, Low Voltage Directive 2014/35/UE, Electromagnetic Compatibility 2014/30/UE. In order to certify the product, the
manufacturer declares under own responsibility the compliance with the EN 13241-1 PRODUCT NORMS.

English

Meccanica Fadini s.n.c.

Director in charge

Содержание BAYT 980

Страница 1: ...to 8 metres Stainless steel and painted versions Version with aluminium fence Version with articulated beam Folding or fixed leg with forked end Fully convertible into right or left versions Pre set...

Страница 2: ...edestrian entrance it is appropriate to prepare the system in such a way to prohibit the operation of the engine when the pedestrian entrance is used Apply safety nameplates with CE marking on the gat...

Страница 3: ...p of two modules 2 10 m 3 20 m 9 Folding leg optional 10 Fixed pedestal with beam catcher optional Bayt 980 internal view Left LH Bayt 980 internal view Right RH MAIN ELEMENTS FOR THE INSTALLATION OF...

Страница 4: ...FOR TWO BARRIERS For installations that require two Bayt 980 roadway barriers it is necessary to arrange an underground electrical conduit between the two housing cabinets for the connection of the ph...

Страница 5: ...o the ground it is necessary to wait until the concrete has hardened the Bayt 980 housing cabinet can be mounted onto it and then the four M14 hexagonal nuts can be securely tightened with their respe...

Страница 6: ...ion of 1 mm will have to be utilised for a maximum distance of 50 metres For distances longer than 50 metres it is recommended that cables with sections suitable for a proper standard of installation...

Страница 7: ...in order to fit the beam Beam clamp with 8 attachment screws R532 aluminium barrier beam Led signal lamp always lighted R532 aluminium barrier beam Loosen the screws located underneath the coupling c...

Страница 8: ...RWEIGHTS ON THE BAYT 980 In Bayt 980 installations with beams that are 6 40 metres in length or longer and fittted with a fence it is necessary to also attach counterweights by means of nuts bolts and...

Страница 9: ...allation it is possible to apply a hinge coupling to Bayt 980 following the instructions in Pic 15 INSTALLATION OF THE BAYT 980 WITH MAGNETIC LOOP Ceiling height H 2 50 m 2 70 m 2 80 m 3 00 m 3 70 m 4...

Страница 10: ...essary to remove the protective covers 22 unscrewing the M8 nut 20 from inside of the cabinet and then removing the stop plate 21 Pic 19 The housing cabinet is in this way prepared for the attachment...

Страница 11: ...use 1 A Red Yellow Green 27 28 29 23 24 27 28 29 23 24 PHASE External power supply 230 V 50 Hz Drive unit COS 982 PHOTOCELL AND SAFETY EDGES Red Yellow Green Common External 230 V 50 Hz electrical pow...

Страница 12: ...rminals of the Elpro 980 master respectively with the 3 4 5 terminals of the Elpro 980 slave Elpro 980 master PCB Elpro 980 slave PCB 63 64 65 66 60 61 Fuse 1 A Red Yellow Green 1 2 3 4 5 6 7 8 9 10 1...

Страница 13: ...6 lock nut d previously loosened must be tightened so as to lock the fork to the Bayt 980 base 5 Unscrew the closing limit switch feeler a until the micro switch snaps when the beam is in horizontal p...

Страница 14: ...l position It is recommended that the limit vertical position is adjusted beyond 90 in this way the limit switch feeler is caused to operate before the very end of the permitted stroke 3 Micro switch...

Страница 15: ...ecific unlocking spanner to release turn the release spanner in an anti clockwise direction max 1 2 turns Important at the moment of the first running test at the factory the thrust force is calibrate...

Страница 16: ...n series or all flashing simultaneously Pic 29 English BAYT 980 Pic 28 Pic 29 max 460 mm 510 8 100 max net length Important dimensions are variable based on the number of counterweights attached See t...

Страница 17: ...4 80 354 FRONT M14 510 260 135 150 150 net length 200 135 65 3 370 2 100 300 100 3 200 Pic 30 In zinc coated iron Weight 10 kg each Zinc coatedorstainlesssteelversion Zinc coatedanchorbolts M14x200 In...

Страница 18: ...Pump Fence Cable KIT Beam length m Applications Leds 18 COS 982 HYDRAULIC DRIVE UNIT OVERALL DIMENSIONS English BAYT 980 Pic 31 66 230 mm 180 140 370 110 345 250 160 blue brown black yellow green Imp...

Страница 19: ...g away of the beam in the direction of the impact with a vehicle and has been designed to protect the main structural components of BAYT 980 barrier and beam Following an impact it is required that th...

Страница 20: ...100 10 10 1 2 3 Beam HOW TO FIX THE BEAM TO ALA 180 SWING AWAY SYSTEM E6 Pic 35 Once the beam is well fitted in tighten hard the screws of the joint Before tightening M10 screw and locknut make sure...

Страница 21: ...BAYT 980 M10 M10 1 2 3 4 5 6 Before tightening M10 screw and locknut make sure the beam is perpendicular vertical in opening M10 M10 M6x14 INOX E5 BRINGING BACK ALA 180 SWING AWAY SYSTEM TO ORIGINAL P...

Страница 22: ...22 English oil hydraulic barrier BAYT 980...

Страница 23: ...per gate leaf Weight per gate leaf Installation date Quantity of models installed Maintainer Date NOTE WELL this document must record any ordinary and extraordinary services including installation mai...

Страница 24: ...ice cycle opening 14 s dwell 7 s closing 14 s dwell 7 s Complete cycle time 42 s Complete cycles opening dwell closing dwell No 86 hour Annual cycles with 8 hours of use per day No 251 000 PERFORMANCE...

Отзывы: