APROLI 280 BATT SAME VERSION FOR BOTH RIGHT AND LEFT INSTALLATIONS
Aproli 280 Batt is not designed as a handed ie. left- or right-hand unit; it comes in a single version factory pre-set to be installed to
the left handside of the gate (gate closed, view from inside). For those installations where the operator is on the right handside, it
is required that the rotation shaft be set accordingly (Pic. 9 and Pic. 10).
PRELIMINARY STEP - CHECKING THE FIXING POINTS
It is fundamental that the arm be attached onto the gate in a structural point.
The fixing of the operator back bracket depends on this point and consequently also the position/outlet of the tube for the electrical
connections and voltage supply (Pic. 4).
The gate post fixing bracket has two openings in the back side towards the gate post and two underneath: in this way it can meet
any application requirements (Pic. 4).
Pic. 3
Pic. 4
!
View from inside
Aproli 280 Batt
mounted on the
right
Gate post
fixing
bracket
Arm bracket
for on-the-
gate fixing
E
n
g
li
sh
5
A
Aproli 280 Batt, as default version, comes factory pre-set to be installed on the left, gate in
closed position. For Aproli 280 Batt to be installed on the right, the shaft is to be rotated
into the correct in-phase position (Pic. 9 and Pic. 10).
!
IMPORTANT: It is required that the operator arm be fixed to the gate in a structural position, the most suitable
to take it being the strongest and most robust. The position of the gate post fixing bracket and therefore of
the electric power cable inlet is to be established consequently.
105
140
110
180
130
228
External oil-hydraulic operator with articulated arm
for swinging gates mounted on large pillars
APROLI 280 Batt
Aproli 280 Batt
mounted on the
left