Aproli 280 Batt
installed on the
left
Aproli 280 Batt
installed on the
right
Aproli 280 Batt
installed on the
right
E
n
g
li
sh
Should the shaft turn in the
wrong direction, supply
power to the other phase
Hole
Hole
Shaft already set in position
M8 fixing pin
M8 fixing pin
FIXING THE ARM
In order to mount the arm, it is required that the motor be supplied with voltage so it can rotate the square shaft towards the opening
direction of the gate. Fit the arm and fix the retaining pin into the hole.
Pic. 10
Pic. 11
!
!
IMPORTANT
: the hole in the flattened surface of the square shaft is a reference
point. Aproli 280 Batt is factory pre-set to be installed on the left. If installed on
the right, the shaft is to be rotated 205° to get it in the correct position.
IMPORTANT: screw M8 pin into the shaft hole to fix the arm.
230 V - 50 Hz
Turn to the end of the
permitted rotation
blue
c
ommon
External oil-hydraulic operator with articulated arm
for swinging gates mounted on large pillars
APROLI 280 Batt
8
Aproli 280 Batt
installed on the
left
phase