BIG ASTOR S.r.l.
FACSIMILE
______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Use and maintenance manual
page 13 of 16
LIFTING AND STORAGE
Lifting of a single unit can be done by one person. Several units can be stored piled
up on a platform. Their transportation should be done with adequate slinging and
with the help of an adequate mechanical machine.
Thanks to their conformation, a number of pedestrian tunnels
can be piled up one on another which allows to pack them in
a pallet before transportation.
MAINTENANCE
ROUTINE MAINTENANCE
After use both the machine and its components need to be cleaned. Make sure that
the mechanical parts which help open and close the supports (part 1 and part 2, see
the picture) are always clean from dirt or debris. Whenever necessary, it is
recommended to apply white anti-dust grease on the two parts to ensure their
continuous and efficient functioning.
Part 1 Part 2
Mechanical parts to lubricate
ATTENTION:
All routine maintenance operations are aimed at ensuring correct functioning of the
machine.