33
FaberFires.com
Non-Combustible Framing
Combustible Framing
A layer of non-combustible material (⅝" Type X fire
resistant drywall or ½" cement board) is required on
the interior (cladding the entire inner cavity/chase)
and exterior of the wood framing . This provides
heat protection for both the combustible framing
and the finishing material .
A clearance of 1/2" is needed between the non-
combustible material and the firebox .
* See "Heat Releases and Air Intakes" section on
page 42 for more information on heat release
and air intake requirements .
A layer of non-combustible material (⅝" Type X fire
resistant drywall or ½" cement board) is required
on the exterior of the metal framing . This provides
heat protection for the finishing material .
A layer of non-combustible material (⅝" Type
X fire resistant drywall or ½" cement board) is
recommended on the inside of the chase when a
television (or similar element) will be installed above
the fireplace . See "Television Mounting Information"
for more details . A clearance of 1/2" is needed
between the non-combustible material and the
firebox .
* See "Heat Releases and Air Intakes" section on
page 42 for more information on heat release
and air intake requirements .
Non-Combustible Material
(⅝" Type X Fire Resistant
Drywall or ½" Cement Board)
Metal Studs
Wood Studs
Non-Combustible Material
(⅝" Type X Fire Resistant
Drywall or ½" Cement Board)
Chase and Framing Installation and Planning
Содержание FEG4916F
Страница 9: ...9 FaberFires com Fireplace Information Maintenance Log Service Date Notes...
Страница 55: ...55 FaberFires com Final Installation Media Arrangement 2 1 4 3 8 6 5 7 13 10 11 9 12 Pilot burner Do not cover...
Страница 79: ...9 Informations sur le foyer Journal de l entretien Date Notes...
Страница 125: ...55 Installation finale 2 1 4 3 8 6 5 7 13 10 11 9 12 Veilleuse ne pas couvrir...