52 / 68
Ver. 1.1 - January 2017 - en-US
Installation
c
1
b
b
b
a
P
lace the plinth in the point designated for the
installation of the station, making sure that the
grooves end up inside the plinth itself
(a)
W
ith the aid of a spirit level, check the correct
horizontal position
(b)
I
f necessary, correct the horizontal plane using
shims
(c)
a
b
b
b
a
a
F
ix the plinth, inserting in order
(a)
▫ C-profile
▫ washer
▫ grower
▫
nut
U
se a level to check that the plinth is perfectly
horizontal and vertical
(b)
Содержание PARQUBE APS
Страница 2: ......
Страница 7: ...7 68 Ver 1 1 January 2017 en US Chapter 1 MANUAL INTRODUCTION ...
Страница 10: ...10 68 Ver 1 1 January 2017 en US This page is intentionally left blank ...
Страница 11: ...11 68 Ver 1 1 January 2017 en US Manual introduction Chapter 2 GENERAL CONDITIONS ...
Страница 17: ...17 68 Ver 1 1 January 2017 en US Chapter 3 STORAGE AND HANDLING ...
Страница 24: ...24 68 Ver 1 1 January 2017 en US This page is intentionally left blank ...
Страница 25: ...25 68 Ver 1 1 January 2017 en US Chapter 4 PRODUCT DESCRIPTION ...
Страница 36: ...36 68 Ver 1 1 January 2017 en US This page is intentionally left blank ...
Страница 37: ...37 68 Ver 1 1 January 2017 en US Chapter 5 ACCESS TO THE PERIPHERAL ...
Страница 42: ...42 68 Ver 1 1 January 2017 en US This page is intentionally left blank ...
Страница 43: ...43 68 Ver 1 1 January 2017 en US Chapter 6 INSTALLATION ...
Страница 60: ...60 68 Ver 1 1 January 2017 en US This page is intentionally left blank ...
Страница 61: ...61 68 Ver 1 1 January 2017 en US Chapter 7 SETTINGS ...
Страница 64: ...64 68 Ver 1 1 January 2017 en US This page is intentionally left blank ...
Страница 65: ...65 68 Ver 1 1 January 2017 en US Chapter 8 DECLARATION OF CONFORMITY ...
Страница 67: ...67 68 Ver 1 1 January 2017 en US This page is intentionally left blank ...
Страница 68: ...HUB Parking Technology a Business Unit of the FAAC Group www hubparking com ...