background image

1

6

4

5

7

8

10

15

11

16

1

2

3

18

14

13

17

9

12

Tr

ansla

tion of the original instruc

tions

ENGLISH

1. BOLLARD J355HA M50

Please read this manual carefully. It accompanies the product, providing important information regarding safety, installation and use.

1.1  GENERAL INSTRUCTIONS

These instructions apply to the model

J355HA M50

This model refers to automatic hydraulic counter-terrorism traffic bollards. The cylinder is moved by a hydraulic unit inside the structure.

1.2  TECHNICAL DESCRIPTIONS AND SPECIFICATIONS

1

Flashing LED

2

Head

3

Cylinder

4

High position magnetic contact (N.C.)

5

Junction box

6

4 stops devices, upper position

7

Oil filler plug with dipstick

8

Hydraulic control unit

9

Lowering solenoid valve

10 Cable guides
11 EFO accumulator
12 Pressure switch
13 EFO solenoid
14 Ø 100 mm hole for drainage or pump connection
15 4 stops devices, lower position
16 Low position magnetic contact (N.C.)
17 Plunger
18 Foundation pit

www.FastGateOpeners.com  |  (800) 878-7829  |  [email protected]

Содержание J355 HA M50 EFO

Страница 1: ...J355HA M50 www FastGateOpeners com 800 878 7829 Sales FastGateOpeners com...

Страница 2: ...currently in force 10 Beforeperforminganyoperationonthesystem disconnectthepowersupply 11 The power mains of the automation system must be fitted with a multi pole power switch with a switch contact...

Страница 3: ...ards The cylinder is moved by a hydraulic unit inside the structure 1 2 TECHNICAL DESCRIPTIONS AND SPECIFICATIONS 1 Flashing LED 2 Head 3 Cylinder 4 High position magnetic contact N C 5 Junction box 6...

Страница 4: ...e C 15 55 Weight of bollard and pit kg 850 bollard 235 pit Oil quantity l 1 6 standard version 6 7 EFO version Ingress protection IP66 Size See 2 Condenser 2 70 F 400V Resistance to breakage J 3 18520...

Страница 5: ...STALLATION 2 1 CONFIGURATION A flexible hose with a diameter of 100 mm should be fitted for drainage Dig the hole to a depth of approximately 1 85 m Dimensions in mm UNPROTECTED AREA IMPACT DIRECTION...

Страница 6: ...instructions ENGLISH 2 2 CONSTRUCTION OF THE FOUNDATION CAGE Build the foundation cage not supplied by FAAC as shown in 4 using the 12mm and 20 mm iron rods CLASS B450C www FastGateOpeners com 800 878...

Страница 7: ...lectronic board 7 Pour class C30 37 concrete around the cage to secure it properly up to about 10 cm from ground level Wait a minimum of 7 days to allow the concrete to cure properly Laythepipingneces...

Страница 8: ...0 pursuant to UNI EN 12620 The bollard must only be installed once the concrete has cured for at least 7 days The compaction index of the surrounding soil should be at least 90 of the optimal Proctor...

Страница 9: ...ndpassedthrough the cable guides provided on the pit sheet 8 1 and through the two corrugated conduits supplied with the pit Pass the wires through on the guides on the bollard frame as per as 8 2 the...

Страница 10: ...d resting it against the coun terframe remove the two eye bolts 11 1 and fix the bollard in place using the 24 TCEI M24x50 screws supplied with the pit IMPORTANT Tighten the screws to a torque of 50Nm...

Страница 11: ...rewandremovethefourTORXT30screwssecuringthecover of the hydraulic control unit in place 13 1 4 Remove the cover of the hydraulic control unit 5 Unscrewthelocknut 13 2andloosenthescrew 13 3tomove the c...

Страница 12: ...pressure switch EFO solenoid valve Heater optional Refer to the diagram below EFO N O connection activtes also in case of black out EFO N C connection voluntary activation only Before performing any w...

Страница 13: ...Y 7 PresstheFbuttonandholditdownwhilstsimultaneouslypressing the button to exit programming screen and save the changes made For more information on programming the equipment please refer to the relev...

Страница 14: ...STOP LOOP 1 LOOP 2 LOOP 2 LOOP 1 CLOSE FSW EMERGENCY OUT 1 OUT 2 OUT 3 GND GND 24 V 24 V OUT 3 3 7 11 13 1 dF 06 LO C 3 03 Y 4 LO Cu F F F F F F F F F F 10 s F F 10 s Translation of the original instr...

Отзывы: