background image

13

16

1

3

2

5

4

5

Tr

ansla

tion of the original instruc

tions

ENGLISH

2.7 EFO (EMERGENCY FAST OPERATION - 

OPTIONAL)

The bollard J355HA M50 can be equipped with an EFO (Emergency 
Fast Operation) emergency activation system, which can be activated 
at any time to raise the cylinder immediately. The EFO system consists 
of a tank, a pressure switch and a solenoid control valve powered by 
230V ~
In order to connect the solenoid valve (this varies depending on the 
N.O. / N.C. option adopted), refer to 

13

, terminals 4 and 5.

The N.O. solenoid valve (“Blackout” model) enables the EFO to be 
activated, both on the command of the operator and in the event of 
a power failure, while the N.C. version only allows for the voluntary 
activation of the device.

2.8 MANUAL OPERATION (OPTIONAL)

In order to manually lower the bollard, use the release device in ac-
cordance with the following guidelines:
1. Unscrew and remove the six M8x40 screws that secure the top

cover in place (

12

).

2.  Remove the top cover.
3.  Unscrew and remove the four TORX T30 screws securing the cover 

of the hydraulic control unit in place (

13

-

1

).

4.  Remove the cover of the hydraulic control unit.
5.  Unscrew the lock nut 

13

-

2

 and loosen the screw 

13

-

3

 to move

the cylinder downwards.

2.9 AUTOMATIC OPERATION

To restore automatic operation:
1. Turn the screw 

13

-4 until the stop point in order to restore

automatic operation.

2.  Tighten the lock nut 

13

-

5

3.  Reposition the hydraulic control unit cover and fix in position using

the TORX T30 screws (

13

-

1

)

4. Reposition the top cover and fix in position using the M8x40

screws (

12

).

2.10 MAINTENANCE

The standard sequence of routine maintenance is as follows:

1.  Clean the pit by sucking out any deposited material
2.  Clean the water drainage systems at the bottom of the pit
3. Check and if necessary rectify any oil leaks from the movement

piston

4. Carry out a general check to ensure that the bollard screws are

correctly tightened

5. Carry out a general clean of the moving cylinder and touch up

any paintwork

6.  Check the hydraulic control unit, topping up the oil level
7.  Check to ensure the EFO system is functioning properly

www.FastGateOpeners.com  |  (800) 878-7829  |  [email protected]

Содержание J355 HA M50 EFO

Страница 1: ...J355HA M50 www FastGateOpeners com 800 878 7829 Sales FastGateOpeners com...

Страница 2: ...currently in force 10 Beforeperforminganyoperationonthesystem disconnectthepowersupply 11 The power mains of the automation system must be fitted with a multi pole power switch with a switch contact...

Страница 3: ...ards The cylinder is moved by a hydraulic unit inside the structure 1 2 TECHNICAL DESCRIPTIONS AND SPECIFICATIONS 1 Flashing LED 2 Head 3 Cylinder 4 High position magnetic contact N C 5 Junction box 6...

Страница 4: ...e C 15 55 Weight of bollard and pit kg 850 bollard 235 pit Oil quantity l 1 6 standard version 6 7 EFO version Ingress protection IP66 Size See 2 Condenser 2 70 F 400V Resistance to breakage J 3 18520...

Страница 5: ...STALLATION 2 1 CONFIGURATION A flexible hose with a diameter of 100 mm should be fitted for drainage Dig the hole to a depth of approximately 1 85 m Dimensions in mm UNPROTECTED AREA IMPACT DIRECTION...

Страница 6: ...instructions ENGLISH 2 2 CONSTRUCTION OF THE FOUNDATION CAGE Build the foundation cage not supplied by FAAC as shown in 4 using the 12mm and 20 mm iron rods CLASS B450C www FastGateOpeners com 800 878...

Страница 7: ...lectronic board 7 Pour class C30 37 concrete around the cage to secure it properly up to about 10 cm from ground level Wait a minimum of 7 days to allow the concrete to cure properly Laythepipingneces...

Страница 8: ...0 pursuant to UNI EN 12620 The bollard must only be installed once the concrete has cured for at least 7 days The compaction index of the surrounding soil should be at least 90 of the optimal Proctor...

Страница 9: ...ndpassedthrough the cable guides provided on the pit sheet 8 1 and through the two corrugated conduits supplied with the pit Pass the wires through on the guides on the bollard frame as per as 8 2 the...

Страница 10: ...d resting it against the coun terframe remove the two eye bolts 11 1 and fix the bollard in place using the 24 TCEI M24x50 screws supplied with the pit IMPORTANT Tighten the screws to a torque of 50Nm...

Страница 11: ...rewandremovethefourTORXT30screwssecuringthecover of the hydraulic control unit in place 13 1 4 Remove the cover of the hydraulic control unit 5 Unscrewthelocknut 13 2andloosenthescrew 13 3tomove the c...

Страница 12: ...pressure switch EFO solenoid valve Heater optional Refer to the diagram below EFO N O connection activtes also in case of black out EFO N C connection voluntary activation only Before performing any w...

Страница 13: ...Y 7 PresstheFbuttonandholditdownwhilstsimultaneouslypressing the button to exit programming screen and save the changes made For more information on programming the equipment please refer to the relev...

Страница 14: ...STOP LOOP 1 LOOP 2 LOOP 2 LOOP 1 CLOSE FSW EMERGENCY OUT 1 OUT 2 OUT 3 GND GND 24 V 24 V OUT 3 3 7 11 13 1 dF 06 LO C 3 03 Y 4 LO Cu F F F F F F F F F F 10 s F F 10 s Translation of the original instr...

Отзывы: