manualshive.com logo in svg
background image

J275  HA  2K20 

532270        -  Rev.A

Tr

ansla

tion of the original instruc

tions

ENGLISH

2. SAFETY RECOMMENDATIONS

This product is placed onto the market as “partly completed machin-
ery”, therefore it cannot be commissioned until the machine in which 
it has been incorporated has been identified and declared to conform 
to the Machinery Directive 2006/42/EC by the actual Manufacturer.

!

Incorrect installation and/or incorrect use of the product might cause 
serious harm to people.  Read and comply with all the instructions 
before starting any activity on the product.  Keep these instructions 
for future reference.
Perform installation and other activities adhering to the sequences 
provided in the instructions manual.
Always comply with all the requirements contained in the instructions 
and warning tables at the beginning of the paragraphs.  Always 
comply with the safety recommendations.
Only the installer and/or maintenance technician is authorised to 
work on the automation components.  Do not modify the original 
components in any way.
Close off the work site (even temporarily) and prevent access/tran-
sit.  EC countries must comply with the legislation that transposes 
the European Construction Site Directive 92/57/EC.

The installer is responsible for the installation/testing of the automa-
tion and for completing the Register of the system.
The installer must prove or declare to possess technical and profes-
sional proficiency to perform installation, testing and maintenance 
activities according to the requirements in these instructions.

Installation activities require special work conditions to reduce to the 
minimum the risks of accidents and serious damage.  Furthermore, 
the suitable precautions must be taken to prevent risks of injury to 
persons or damage.

!

The installer must be in good physical and mental condition, aware 
of and responsible for the hazards that may be generated when using 
the product.
The work area must be kept tidy and must not be left unattended.
Do not wear clothes or accessories (scarves, bracelets, etc.) that may 
get caught in moving parts.
Always wear the personal protective equipment recommended for the 
type of activity to be carried out.
The required level of workplace lighting must be equal to at least 
200 lux.
Operate CE marked machinery and equipment in compliance with 
the manufacturer's instructions.  Use work instruments in good 
conditions.
Use the transport and lifting equipment recommended in the instruc-
tions manual.
Use safety-compliant portable ladders of adequate size, fitted with 
anti-slip devices at the top and bottom, equipped with retainer hooks.

2.1  INSTALLER SAFETY

Store the product in its original packaging, in closed and dry premises, 
protected from the sun and free from dust and aggressive substances. 
Protect from mechanical stress.  If stored for more than 3 months, 
regularly check the condition of the components and the packaging.

-

Storage temperature: 5°C to 30°C.

-

Percentage of humidity: 30% to 70%.

After having dismantled the product, dispose of it in compliance with 
the current waste disposal regulations.

Components and structural materials, batteries and electronic compo-
nents must not be disposed of together with household waste. They 
must be taken to authorised disposal and recycling centres.

The oil must be gathered in a watertight container and given to an 
authorised disposal and recycling centre.  Do not mix with other 
substances such as antifreeze or transmission fluids.  Keep the used 
oil away from sources of heat and out of the children's reach.  The 
fluid is not hazardous to health.  In case of contact with eyes, skin or 
clothing, wash and rinse the affected parts.
The technical data sheets of the fluids are available on request.

2.2 STORING THE PRODUCT

2.3  DISPOSING OF THE PRODUCT

Содержание J275 HA 2K20

Страница 1: ...J275 HA 2K20 Translation of the original instructions...

Страница 2: ...fs Les clients peuvent faire des copies pour leur usage exclusif Ce manuel a t publi en 2020 Copyright FAAC S p A ab dem 2020 Alle Rechte vorbehalten Kein Teil dieses Handbuchs darf reproduziert gespe...

Страница 3: ...onnections 19 7 2 Installing the solenoid valve 20 Connecting the control coil 20 Multiple connections 21 7 3 Cover 21 A Marcellan EU DECLARATION OF CONFORMITY The Manufacturer Company name FAAC S p A...

Страница 4: ...d drafting the instruc tions for use and maintenance of the machine It should be clearly understoodthatFAACS p A acceptsnoliabilityforthereliabilityand orcompletenessoftheaboveinstructions Assuch them...

Страница 5: ...st be in good physical and mental condition aware of and responsible for the hazards that may be generated when using the product The work area must be kept tidy and must not be left unattended Do not...

Страница 6: ...e the presence of flamma ble gases or fumes is a serious safety hazard the product is not 94 9 EC ATEX certified It is prohibited to power the system with energy sources other than those specified It...

Страница 7: ...e module x7 5 Base with water drainage holes Pit 3 7 COMPONENT IDENTIFICATION 3 6 TECHNICAL CHARACTERISTICS The cylinder is moved by an internal hydraulic unit A release device protected by a security...

Страница 8: ...l min Lifting time 8 s Lowering time 4 5 s Ambient operating temperature 15 C to 55 C Ambient operating temperature with optional heater 40 C to 55 C Type of use Intensive Bollard weight 160 kg Pit w...

Страница 9: ...ies with applicable regulations in the country of installation Provide the following for each bollard an FG7OR 0 6 1kV 16G1 5 cable maximum length 50 m This code refers to European standards and descr...

Страница 10: ...onbox3throughthecable gland provided 2 4 Connect the conductors to the external junction box and the control board following the instructions in section 5 3 5 Check that the bollard operates correctly...

Страница 11: ...ning torques given in 9 10 Fasten the cover to the frame using the eight M6x20 screws To reposition or lift the cover prise one of the two slots upwards using a screwdriver 5 2 MANUAL OPERATION Before...

Страница 12: ...eplace the plugs 1 4 Lift the head in order to access the release device 5 Actuate the release device by turning the knob anticlockwise RESTORING AUTOMATIC OPERATION 1 14 Actuate the release device by...

Страница 13: ...3 21 26 24 22 20 MOT1 COM MOT2 COM COM LAMP FAN J1 N L PE J5 J3 12 J2 J9 M S 13 1 2 3 4 5 7 8 6 10 9 12 13 11 24V Translation of the original instructions ENGLISH 5 3 CONNECTIONS Lights UPPER limit sw...

Страница 14: ...e bollard J275 HA 2K20 by performing the following operation 1 Accesslevel1programmingbyholdingdowntheFbuttononthe board 19 The letters dF will appear on the display 2 Release the F button and with th...

Страница 15: ...2 COM COM LAMP FAN J1 J2 M4 M5 M6 1 2 3 4 5 6 J5 J3 1 2 3 1 2 3 J5 J3 4 5 6 4 5 6 1 dF 05 2 o 1 1 1 P1 no o2 12 P2 no 3 b6 Y F F F F F F 10 s 1 dF 05 LO C 2 03 Y b6 Y 3 LO Cu 4 o 3 1 5 P3 no F F F F F...

Страница 16: ...dreachesthehighposition and reverses immediately Make sure that the limit switches are wired correctly 18 Makesurethattheupperlimitswitchisinthe correct position 2 7 The bollard does not raise Make su...

Страница 17: ...Before starting activities wait for the components subject to heating to cool down Do not modify the original components in any way FAAC S p A disclaims any liability for damage caused by components...

Страница 18: ...scleanandifnecessarytouchupthepaintwork Checkthattheautomationsystemoperatescorrectly followingtheset logic when using the various control devices 12 6 2 TOPPING UP THE OIL LEVEL 1 Release and lower t...

Страница 19: ...flange together with the seal provided Insert the cable in to the cable gland 2 and connect it to connector 3 inside the junction box according to the diagram shown in the figure Violet Blue Blue Brow...

Страница 20: ...istribution flange 4 Screw the solenoid valve onto the distribution flange 5 Install the control coil onto the solenoid valve 6 Removetheplugfromthecablegland 34 1 insertthecableand connect it to the...

Страница 21: ...slaveconfiguration connectthecoilsto the inputs of the relative control board master or slave as indicated in the following diagram Master JE275 board Slave JE275 board 7 3 COVER Use the cover to mak...

Страница 22: ...FAAC S p A Soc Unipersonale Via Calari 10 40069 Zola Predosa BOLOGNA ITALY Tel 39 051 61724 Fax 39 051 09 57 820 www faac it www faacgroup com J275 HA 2K20 22 532270 Rev A...

Отзывы: