This manual provides the correct procedures and requirements for 
installing J275 HA 2K20 and maintaining it in a safe condition.
When drafting the manual, the results of the risk assessment con-
ducted by FAAC S.p.A. on the entire product life cycle have been taken 
into account in order to implement effective risk reduction measures.
The following stages of the life cycle of the product have been con-
sidered:

-

Delivery/handling

-

Assembly and installation

-

Set-up and commissioning

-

Operation

-

Maintenance/troubleshooting

-

Disposal at the end of the product’s life cycle

Risks arising from installation and using the product have been taken 
into consideration; these include:

-

Risks for the installation/maintenance technician (technical 
personnel)

-

Risks for the user of the automation system

-

Risks to product integrity (damage)

In Europe, the automation of a bollard falls under the Machinery 
Directive 2006/42/EC and the corresponding harmonised stan-
dards.  Anyone automating bollard (new or existing) is classified as 
the Manufacturer of the Machine.  They are therefore required by law, 
among other things, to carry out a risk analysis of the machine (bollard 
in its entirety) and take protective measures to fulfil the essential 
safety requirements specified in Annex I of the Machinery Directive.
FAAC S.p.A. recommends that you always comply with the EN 12453
standard and in particular that you adopt the safety criteria and de-
vices indicated, without exception, including the dead-man function.
  This manual also contains general information and guidelines, which 
are purely illustrative and not exhaustive, in order to facilitate the ac-
tivities carried out by the Manufacturer of the Machine in all respects 
with regard to carrying out the risk analysis and drafting the instruc-
tions for use and maintenance of the machine. It should be clearly 
understood that FAAC S.p.A. accepts no liability for the reliability and/ 
or completeness of the above instructions.  As such, the manufacturer 
of the machine must carry out all the activities required by the Machi-
nery Directive and the corresponding harmonised standards on the 
basis of the actual condition of the locations and structures where 
the product J275 HA 2K20 will be installed, prior to commissioning 
the machine. These activities include the analysis of all the risks 
associated with the machine and subsequent implementation of all 
safety measures intended to fulfil the essential safety requirements.
This manual contains references to European standards.    The auto-
mation of a bollard must fully comply with any laws, standards and 
regulations applicable in the country where installation will take place. 

Unless otherwise specified, the measurements provided in the instruc-
tions are in mm.

1.  INTRODUCTION TO THE INSTRUCTION MANUAL

1.1  MEANING OF THE SYMBOLS USED

 1 

Symbols: notes and warnings on the instructions

F

WARNING ELECTRIC SHOCK HAZARD - The operation or stage described 
must be performed following the supplied instructions and applicable 
safety regulations.

!

WARNING, PERSONAL INJURY HAZARD OR RISK OF DAMAGE TO COMPO-
NENTS - The procedure or step described must be carried out following the 
instructions provided and according to the applicable safety regulations.

WARNING - Details and specifications which must be respected in order to 
ensure that the system operates correctly.

RECYCLING and DISPOSAL - Components and structural materials, batteries 
and electronic components must not be disposed of together with household 
waste. They must be taken to authorised disposal and recycling centres.

For manual lifting, there should be 1 person for every 20 kg to be lifted.

PAGE E.g.: 

6

  see Page 6.

FIGURE E.g.: 

1

-3  see Figure 1 - detail 3.

TABLE E.g.: 

1

   see Table 1.

§

CHAPTER/SECTION E.g.: §1.1  see section 1.1.

APPENDIX E.g.: 

1

  see Appendix 1.

Содержание J275 HA 2K20

Страница 1: ...J275 HA 2K20 Translation of the original instructions...

Страница 2: ...fs Les clients peuvent faire des copies pour leur usage exclusif Ce manuel a t publi en 2020 Copyright FAAC S p A ab dem 2020 Alle Rechte vorbehalten Kein Teil dieses Handbuchs darf reproduziert gespe...

Страница 3: ...onnections 19 7 2 Installing the solenoid valve 20 Connecting the control coil 20 Multiple connections 21 7 3 Cover 21 A Marcellan EU DECLARATION OF CONFORMITY The Manufacturer Company name FAAC S p A...

Страница 4: ...d drafting the instruc tions for use and maintenance of the machine It should be clearly understoodthatFAACS p A acceptsnoliabilityforthereliabilityand orcompletenessoftheaboveinstructions Assuch them...

Страница 5: ...st be in good physical and mental condition aware of and responsible for the hazards that may be generated when using the product The work area must be kept tidy and must not be left unattended Do not...

Страница 6: ...e the presence of flamma ble gases or fumes is a serious safety hazard the product is not 94 9 EC ATEX certified It is prohibited to power the system with energy sources other than those specified It...

Страница 7: ...e module x7 5 Base with water drainage holes Pit 3 7 COMPONENT IDENTIFICATION 3 6 TECHNICAL CHARACTERISTICS The cylinder is moved by an internal hydraulic unit A release device protected by a security...

Страница 8: ...l min Lifting time 8 s Lowering time 4 5 s Ambient operating temperature 15 C to 55 C Ambient operating temperature with optional heater 40 C to 55 C Type of use Intensive Bollard weight 160 kg Pit w...

Страница 9: ...ies with applicable regulations in the country of installation Provide the following for each bollard an FG7OR 0 6 1kV 16G1 5 cable maximum length 50 m This code refers to European standards and descr...

Страница 10: ...onbox3throughthecable gland provided 2 4 Connect the conductors to the external junction box and the control board following the instructions in section 5 3 5 Check that the bollard operates correctly...

Страница 11: ...ning torques given in 9 10 Fasten the cover to the frame using the eight M6x20 screws To reposition or lift the cover prise one of the two slots upwards using a screwdriver 5 2 MANUAL OPERATION Before...

Страница 12: ...eplace the plugs 1 4 Lift the head in order to access the release device 5 Actuate the release device by turning the knob anticlockwise RESTORING AUTOMATIC OPERATION 1 14 Actuate the release device by...

Страница 13: ...3 21 26 24 22 20 MOT1 COM MOT2 COM COM LAMP FAN J1 N L PE J5 J3 12 J2 J9 M S 13 1 2 3 4 5 7 8 6 10 9 12 13 11 24V Translation of the original instructions ENGLISH 5 3 CONNECTIONS Lights UPPER limit sw...

Страница 14: ...e bollard J275 HA 2K20 by performing the following operation 1 Accesslevel1programmingbyholdingdowntheFbuttononthe board 19 The letters dF will appear on the display 2 Release the F button and with th...

Страница 15: ...2 COM COM LAMP FAN J1 J2 M4 M5 M6 1 2 3 4 5 6 J5 J3 1 2 3 1 2 3 J5 J3 4 5 6 4 5 6 1 dF 05 2 o 1 1 1 P1 no o2 12 P2 no 3 b6 Y F F F F F F 10 s 1 dF 05 LO C 2 03 Y b6 Y 3 LO Cu 4 o 3 1 5 P3 no F F F F F...

Страница 16: ...dreachesthehighposition and reverses immediately Make sure that the limit switches are wired correctly 18 Makesurethattheupperlimitswitchisinthe correct position 2 7 The bollard does not raise Make su...

Страница 17: ...Before starting activities wait for the components subject to heating to cool down Do not modify the original components in any way FAAC S p A disclaims any liability for damage caused by components...

Страница 18: ...scleanandifnecessarytouchupthepaintwork Checkthattheautomationsystemoperatescorrectly followingtheset logic when using the various control devices 12 6 2 TOPPING UP THE OIL LEVEL 1 Release and lower t...

Страница 19: ...flange together with the seal provided Insert the cable in to the cable gland 2 and connect it to connector 3 inside the junction box according to the diagram shown in the figure Violet Blue Blue Brow...

Страница 20: ...istribution flange 4 Screw the solenoid valve onto the distribution flange 5 Install the control coil onto the solenoid valve 6 Removetheplugfromthecablegland 34 1 insertthecableand connect it to the...

Страница 21: ...slaveconfiguration connectthecoilsto the inputs of the relative control board master or slave as indicated in the following diagram Master JE275 board Slave JE275 board 7 3 COVER Use the cover to mak...

Страница 22: ...FAAC S p A Soc Unipersonale Via Calari 10 40069 Zola Predosa BOLOGNA ITALY Tel 39 051 61724 Fax 39 051 09 57 820 www faac it www faacgroup com J275 HA 2K20 22 532270 Rev A...