5
6
7
8
J275 HA 2K20
10
532270 - Rev.A
1
2
3
5
Tr
ansla
tion of the original instruc
tions
ENGLISH
5. INSTALLATION
5.1 INSTALLING THE BOLLARD
!
Use a 1.5mm
2
16 core (15 + earth) cable for the electrical connec-
tions. Use a cable that complies with local regulations for use with
230 V~.
The maximum cable length is 50 m.
1. Place the cable inside the flexible sheath and make it protrude
from the pit by 1.6m.
2.
5
Fasten the cable to the frame using the cable gland provided
1
.
3. Insert the cable into the external junction box
3
through the cable
gland provided
2
.
4. Connect the conductors to the external junction box and the
control board following the instructions in section § 5.3.
5. Check that the bollard operates correctly, according to the logics
set on the board, as well as all the accessories that are connected.
6. Remove the top cover
6
.
7. Screw the two M10 eyebolts, provided, onto the top of the frame
7
.
8. Lift the bollard and insert it completely into the pit.
8
.
Position the
bollard so that the junction box is on the same side as the cable inlet.
!
Use belts or chains and a lifting device that are suitable for the weight
of the bollard.
Take care not to damage the electrical cable by pinching it between
the frame and the pit.