manualshive.com logo in svg
background image

WARNINGS

• Important! For the safety of people, it is important that all the instructions be carefully observed.
• Incorrect installation or incorrect use of the product could cause serious harm to people.
• Carefully read the instructions before beginning to install the product and keep them for future  

 

   reference.
• The symbol 

 indicates notes that are important for the safety of persons and for the good condition 

   of the automated system.
• The symbol

  draws your attention to the notes on the characteristics and operation of the 

    product.

CE DECLARATION OF CONFORMITY 

Manufacturer:

 FAAC S.p.A.

Address:

 

Via Benini, 1  - 40069  Zola Predosa BOLOGNA - ITALY

Declares that:

  Control board mod. E 700,

 

• conforms to the essential safety requirements of the following EEC directives:

2006/95/EC Low Voltage Directive 

 

2004/108/EC Electromagnetic Compatibility Directive

 Additional 

information:

 

This product underwent a test in a typical, uniform configuration

 

(all products made by FAAC S.p.A)

Bologna, 

01 

Mars 

2008. 

     The 

Managing 

Director

 

 

       A. 

Bassi

1 BOX 

LAYOUT 

..................................................................................................................2

2 WARNINGS 

....................................................................................................................3

LAYOUT AND CONNECTIONS .........................................................................................3

4 TECHNICAL 

SPECIFICATIONS 

 

........................................................................................4

4.1  DESCRIPTION OF COMPONENTS ........................................................................................... 4

4.2  DESCRIPTION OF TERMINAL-BOARDS .................................................................................... 4

PROGRAMMING THE LOGIC ..........................................................................................4

PROGRAMMING THE SPEED ...........................................................................................4

7. START-UP 

........................................................................................................................5

7.1   LEDS CHECK ........................................................................................................................ 5

7.2

DIPS-SWITCH PROGRAMMING .............................................................................................. 5

7.3    PRE-FLASHING .................................................................................................................... 5

7.4   TIME LEARNING - SET-UP....................................................................................................... 5

7.4.1 AUTOMATIC SET-UP 

........................................................................................................................ 5

7.4.2 MANUAL SET-UP 

............................................................................................................................. 5

INSTALLATION OF BUS ACCESSORIES .............................................................................6

8.1   ADDRESSING BUS ENCODER ................................................................................................ 6

8.2   ADDRESSING THE BUS PHOTOCELLS  .................................................................................... 6

8.3   MEMORY STORAGE  OF BUS ACCESSORIES.......................................................................... 7

MEMORY STORING THE RADIO CODE ............................................................................7

9.1   MEMORY STORAGE OF DS RADIO CONTROLS ...................................................................... 8

9.2   MEMORY STORAGE OF SLH RADIO CONTROLS .................................................................... 8

9.3   MEMORY STORAGE OF LC RADIO CONTROLS  (for some markets only) ............................. 8

9.3.1  REMOTE MEMORY STORAGE OF LC RADIO CONTROLS ................................................................. 9

9.4   RADIO CONTROLS DELETION PROCEDURE ........................................................................... 9

10  CONNECTION OF BUFFER BATTERIES (OPTIONAL) ...........................................................9

10.1  BATTERY KIT .......................................................................................................................... 9

11  AUTOMATED SYSTEM TEST..............................................................................................9

12 LOGIC 

TABLES 

...............................................................................................................10

INDEX

ENGLISH

1

Содержание E700

Страница 1: ...E 700 E 700...

Страница 2: ...tion This product underwent a test in a typical uniform configuration all products made by FAAC S p A Bologna 01 Mars 2008 The Managing Director A Bassi 1 BOX LAYOUT 2 2 WARNINGS 3 3 LAYOUT AND CONNEC...

Страница 3: ...lid hinges can be moved upward to allow opening the box housing Fig 3 they can also be removed and re positioned in order to enable the lid to open to the right or left When you have secured the box i...

Страница 4: ...g any work on the control unit connections maintenance always turn off power Install upstream of the system a differential thermal breaker with adequate tripping threshold Always separate power cables...

Страница 5: ...C Device with NC contact which causes contact which causes the automated the automated system to shut down system to shut down 4 OPEN B Device with N O contact see chap FUNCTION LOGICS 5 OPEN A J10 RE...

Страница 6: ...est automated system condition is shown in bold Check the status of the signalling LEDs as per table below Tab 1 Operation of inputs status LEDs If you connect an electric lock to terminal J4 position...

Страница 7: ...LEDs of both encoders show the FLASHING status In this situation refer to the configuration in TAB 3 to define which encoder connection to rotate DL 3 indicates on a steady flashing beam the reading o...

Страница 8: ...ect the main power supply transformer output and then any batteries Quickly press once only the SW1 SET UP push button to execute learning The BUS LED flashes Give an OPEN impulse leaves will move and...

Страница 9: ...e automated system performs one opening operation Make sure that the automated system is free of any obstacle created by persons or things To add other radio controls transfer the code of the memory s...

Страница 10: ...EDURE To delete ALL the input radio control codes press push button LOGIC SW3 or SPEED SW2 and while holding it down also press push button SETUP SW1 for 10 sec The LED relating to the pressed push bu...

Страница 11: ...OPEN CLOSED opens leaves opens leaf 1 no effect opening inhibited no effect opening inhibited no effect no effect opening inhibited opens leaves OPENING stops operation 1 stops operation stops operat...

Страница 12: ...rliegendem Handbuch sind unverbindlich FAAC beh lt sich das Recht vor ohne die wesentlichen Eigenschaften dieses Ger tes zu ver ndern und ohne Verbindlichkeiten in Bezug auf die Neufassung der vorlieg...

Отзывы: