1
ENGLISH
INDEX
B680H AUTOMATED SYSTEM
1. TECHNICAL SPECIFICATIONS ............................................................................................................................................................3
1.1 Summary table ...............................................................................................................................................................................3
1.2 Key Fig.5 .........................................................................................................................................................................................3
1.3 Key Fig.6 .........................................................................................................................................................................................3
2. ELECTRICAL PREPARATIONS (standard system) ............................................................................................................................3
3. BARRIER DIMENSIONS ........................................................................................................................................................................3
4. INSTALLING THE AUTOMATED SYSTEM ...........................................................................................................................................3
4.1 Preliminary checks .......................................................................................................................................................................3
4.2 Walling in the foundation plate ...................................................................................................................................................3
4.3 Electrical preparations .................................................................................................................................................................3
4.4 Mechanical installation ................................................................................................................................................................3
4.5 Balancing the barrier ....................................................................................................................................................................4
5. START-UP
...............................................................................................................................................................................................4
5.1 Connecting the control equipment .............................................................................................................................................4
5.2 Testing the automated system ....................................................................................................................................................4
6. MANUAL OPERATION ..........................................................................................................................................................................4
7. RESTORING NORMAL OPERATION ....................................................................................................................................................4
8. MAINTENANCE .....................................................................................................................................................................................4
8.1 Topping up the oil .........................................................................................................................................................................4
8.2 Air bleeding ...................................................................................................................................................................................4
9. REVERSING THE OPENING DIRECTION ............................................................................................................................................5
10. ACCESSORIES ....................................................................................................................................................................................5
10.1 Installing a photocell .................................................................................................................................................................5
10.2 Installing the bar light kit ...........................................................................................................................................................5
10.3 Installation of a receiver antenna .............................................................................................................................................5
11. REPAIRS
...............................................................................................................................................................................................5
E680 CONTROL BOARD
1. WARNINGS ............................................................................................................................................................................................6
2. DESCRIPTION OF THE COMPONENTS ..............................................................................................................................................6
3. TECHNICAL SPECIFICATIONS ............................................................................................................................................................6
4. ELECTRICAL CONNECTIONS ..............................................................................................................................................................7
4.1 Terminal board J1 (inputs) ...........................................................................................................................................................7
4.2 Terminal board J2 (outputs).........................................................................................................................................................8
4.3 Terminal board J3 (external fl ashing lamp) ...............................................................................................................................8
4.4 Terminal board J4 (loop detector) ..............................................................................................................................................8
4.5 Connector J5 (Motor)....................................................................................................................................................................8
4.6 Connector J7 (Encoder) ...............................................................................................................................................................8
4.7 Connector J10 (Radio) ..................................................................................................................................................................8
4.8 Connector J11 (Beam break-out sensor) ...................................................................................................................................8
4.9 Connector J12 (Emergency battery) ...........................................................................................................................................8
4.10 Connector J13 (36VDC Power Supply) .....................................................................................................................................8
4.11 Connector J15 (fl ashing traffi c light) ........................................................................................................................................8
4.12 Connector J16 (beam lights) ......................................................................................................................................................8
5. PROGRAMMING ....................................................................................................................................................................................9
5.1 Basic confi guration .......................................................................................................................................................................9
5.2 Changing the predefi ned parameters set ................................................................................................................................10
5.3 BUS accessories menu .............................................................................................................................................................. 11
6. Advanced Confi guration ....................................................................................................................................................................12
6.1 Confi guring the loop detector ...................................................................................................................................................13
6.2 Expert Confi guration ..................................................................................................................................................................14
6.3 Pre-Defi ned Parameter Sets ......................................................................................................................................................17
6.4 “Expert” default parameters .....................................................................................................................................................18
7. START-UP
.............................................................................................................................................................................................18
7.1 Verifying the diagnostic LEDs ...................................................................................................................................................18
7.2 Setup .............................................................................................................................................................................................18
8. TESTING THE AUTOMATED SYSTEM ...............................................................................................................................................18
9. MASTER/SLAVE CONFIGURATION ...................................................................................................................................................19
10. INTERLOCK .......................................................................................................................................................................................20
11. OPERATING LOGICS TABLE ............................................................................................................................................................21
12. BALANCING TABLES .......................................................................................................................................................................24
13. DEFAULT SELECTION TABLES (
cF
parameter) ............................................................................................................................25
Raccolta immagini - Pictures collection - Collection d’images - Photo Kollection - Conjunto de imagenes - Afbeeldingen
Содержание B680
Страница 1: ...B680H...
Страница 2: ......
Страница 30: ...28 Fig 17 Fig 17 L...
Страница 31: ...29 Fig 18 Fig 18 Fig 19 Fig 19 1 2 Fig 20 Fig 20...
Страница 32: ...30 Fig 21 Fig 21...
Страница 35: ...33 Fig 31 Fig 31...
Страница 36: ...34 Fig 32 Fig 32...
Страница 41: ...5 1 2 Fig 18...