manualshive.com logo in svg
background image

6

12)

Prepare the protective housing and fit it on the operator
as shown in Fig. 11.

A) Insert the two anti-vibration spacers 

 onto the front

flange.

B) Introduce the housing, pressing it firmly on the rear cover

.

C) Secure the housing with the self-tapping screw 

.

D) Fit the front cover 

 on the housing and fasten it with

FIX plug 

.

13)

Fit the electric cable bend guard (ref.

, Fig. 14).

14)

Re-lock the operator and make the electrical connections
of the selected electronic control unit following the relevant
instructions.

Fig. 11

Fig. 12

4.

START-UP

4.1.

ADJUSTING THE ANTI-CRUSHING SYSTEM

The 422 automated system has an anti-crushing safety device
which limits the operator's force if an obstacle is encountered
while the gate is moving. To adjust the intervention threshold of
the anti-crushing system, temporarily open the release unit.
- Lift the protective plug (Fig. 12, ref. 

) and fit the supplied key

(Fig. 12, ref. 

).

Содержание 104200177

Страница 1: ...Leading the way Installation Manual 422 Leading the way Swing Gate System...

Страница 2: ...OMATED SYSTEM TEST p 16 7 MANUAL OPERATION p 16 8 RESTORING NORMAL OPERATION MODE p 17 9 SPECIAL APPLICATIONS FOR SWING LEAF GATES p 17 9 1 OPENING TOWARD THE OUTSIDE WITH OPERATOR INSTALLED INSIDE p...

Страница 3: ...ger areas against mechanical movement Risks such as crushing dragging and shearing 16 Use of at least one indicator light e g FAACLIGHT is recommended for every system as well as a warning sign adequa...

Страница 4: ...ys separate the connection cables of the low voltage accessories from the 230 V power cables Use separate sheaths to avoid any type of interference Fig 3 Fig 2 E P Y T R O T A R E P O D R A D N A T S...

Страница 5: ...unctionality we recommend you to respect the indicated dimensions For iron pilasters accurately weld the rear attachment ref Fig 6 directly on the pilaster For masonry pilasters select one of the foll...

Страница 6: ...two weld spots protecting the rod against any welding waste NB If the gate structure does not permit the attachment to be firmly fastened take action on the structure creating a solid support base 10...

Страница 7: ...e bend guard ref Fig 14 14 Re lock the operator and make the electrical connections of the selected electronic control unit following the relevant instructions Fig 11 Fig 12 4 START UP 4 1 ADJUSTING T...

Страница 8: ...Finish the installation operations as follows Close the cover of the release device with the key Remove the breather screw Fig 14 ref 6 AUTOMATED SYSTEM TEST When you have finished installing apply t...

Страница 9: ...ening direction To reduce torque turn the screws anti clockwise To increase torque turn the screws clockwise Fig 16 Table C Recommended dimensions for standard operators Rod effective stroke maximum d...

Страница 10: ...t p a h c w e r c s r e h t a e r b e h t d e v o m e r e v a h u o y t a h t e r u s e k a M r i a y n a e s a e l e r o t r e d r o n i s e l c y c g n i s o l c d n a g n i n e p o e t a g e t e l...

Страница 11: ..._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ n a i c i n h c e T r e m o t s u C 9 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _...

Страница 12: ...ric lock as they guarantee mechanical locking of the leaf when the motor is not operating The other models without a hydraulic locking always require one or more electric locks to ensure the leaf is m...

Страница 13: ...12 QRWH QRWHV QRWH QRWDV DQPHUNXQJ RSPHUNLQJHQ...

Страница 14: ...for either technical or commercial reasons at any time and without revising the present publication FAAC UK Limited 6 Hamilton Close Houndmills Estate Basingstoke RG21 6YT Telephone 01256 318100 Fax 0...

Отзывы: