
Figure 10: Four-point rack mounting brackets installed on a chassis
Warning: Due to the weight of the platform, at least two people are required to install this chassis into a
rack. Failing to use two people can result in severe personal injury or equipment damage.
Important: The maximum rack mount depth supported by the four-point rack mounting rails is 38 inches
(96.52 cm). Using the rails in a rack deeper than this might cause the brackets to be overextended and cause
a structural failure.
After the chassis is installed into a rack, you can install the cable management system, and then supply
power to the chassis. Optionally, you can remove the red handles from the top of the chassis.
Installing the cable management system
After you have installed and secured the chassis to a rack, you can install the cable management system.
1.
Locate the cable routing brackets and covers included with the chassis.
The brackets and covers are in an accessory box that is included with the chassis.
2.
Attach the cable routing brackets to the appropriate location on the chassis (front, middle, or rear) by
tightening the captive screws clockwise until they are completely secured.
31
Platform Guide: VIPRION
®
2400
Содержание VIPRION 2400
Страница 1: ...Platform Guide VIPRION 2400 MAN 0344 05 ...
Страница 2: ......
Страница 6: ...6 Table of Contents ...
Страница 44: ......
Страница 58: ...Figure 16 Airflow in the VIPRION 2400 platform 58 Environmental Guidelines ...
Страница 68: ......
Страница 70: ...70 China RoHS Requirements ...
Страница 71: ...71 Platform Guide VIPRION 2400 ...
Страница 72: ......
Страница 78: ......
Страница 82: ......