Important: If you are installing the chassis into a rack that does not have threaded holes (for example, a
square hole rack), you need to install cage nuts before you can install the chassis. You should install a
minimum of three cage nuts per side.
After you have installed the two-point rack mounting brackets onto the chassis, you can install the chassis
directly into a two-post rack.
Warning: Due to the weight of the platform, at least two people are required to install this chassis into a
rack. Failing to use two people can result in severe personal injury or equipment damage.
1.
Using two or more people, lift the chassis to the appropriate location on the rack.
2.
Secure the two-point rack mounting brackets to the rack using a minimum of three manufacturer-provided
rack screws per side.
The chassis must be fastened to the rack securely to provide adequate stability and prevent the chassis
from falling out of the rack.
3.
(Optional) You can remove the red handles from the top of the chassis.
After the chassis is installed into a rack, you can install the cable management system and supply power to
the chassis.
About the four-point rack mounting rail kit
The four-point rack mounting rail kit helps ease installation and removal of the chassis from a rack. The
rails snap into place in the rack, and no tools are required to install a platform using this kit. The rails are
optimized for installation into square hole cabinets, but they can be installed in other cabinet styles, such
as round hole cabinets, using the screws provided. The rails are easily converted to mount to either cabinet
style.
The rail kit includes these parts:
•
Two rail assemblies (left and right), which consist of an inner rail that you install onto the chassis and
an outer rail that you install in the rack
•
Eight #8-32 thumb screws
•
Two cage nuts
Before you install this platform, review the environmental guidelines to make sure that you are installing
and using the platform in the appropriate environment. You must also remove the pre-installed two-point
rack mounting brackets.
Figure 9: Four-point rack mounting rail kit
For information about installing the platform using the four-point rack mounting rail kit, see the instruction
guide provided by the manufacturer, which is included with the kit hardware.
30
Platform Installation
Содержание VIPRION 2400
Страница 1: ...Platform Guide VIPRION 2400 MAN 0344 05 ...
Страница 2: ......
Страница 6: ...6 Table of Contents ...
Страница 44: ......
Страница 58: ...Figure 16 Airflow in the VIPRION 2400 platform 58 Environmental Guidelines ...
Страница 68: ......
Страница 70: ...70 China RoHS Requirements ...
Страница 71: ...71 Platform Guide VIPRION 2400 ...
Страница 72: ......
Страница 78: ......
Страница 82: ......