Index
A
AC-powered equipment
guidelines
C
cables
connecting
for failover
for power
CD/DVD-ROM drives
support for
chassis
ventilation
chassis ground lug
locating
chassis ventilation
diagram
Configuration utility
licensing the platform
cooling system
platform airflow diagram
D
DC-powered equipment
guidelines
device service clustering (DSC)
DSC, See device service clustering (DSC).
dual stack management IP addresses
E
electrostatic discharge (ESD)
EMI compliance
when connecting cables
ESD, See electrostatic discharge (ESD).
Ethernet hub requirements
F
faceplate
removing the protective films
failover cables
connecting
FIPS platform
G
Gigabit Ethernet
ground lugs
connecting to ground terminal
locating
location
guidelines
battery replacement
H
hardware
AC-powered equipment
DC-powered equipment
hardware requirements
for peripherals
hard-wired failover
hubs
I
indicator LEDs
location
installation
guidelines
performing using serial console
recommendations for
spacing between units
L
LCD
removing the protective film
using to configure the management IP address
license
configuring
M
management interface
connecting Ethernet cable
management IP addresses
configuring dual stack
configuring using LCD
N
negative pressure fan system
P
pass-through adapter, See RJ45F to RJ45M rolled serial
adapter.
platform
about
about grounding
about installing
and hardware provided with
configuring the management IP address
FIPS
SSL
ventilation
platform airflow
diagram
platform cooling
diagram
29
Index
Содержание i5000 Series
Страница 1: ...Setting Up the i5000 i7000 i10000 i11000 Series Platform MAN 0620 08...
Страница 2: ......
Страница 4: ...4 Table of Contents...
Страница 10: ......
Страница 20: ......
Страница 26: ......